My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-1993 Council Packet
Orono
>
City Council
>
1993
>
07-12-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 10:38:15 AM
Creation date
1/8/2024 10:34:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memo - 2700 White Oak Circle <br />July 7. 1993 <br />Page 3 <br />,1-wreviews those repairs proposed by the property owner and his agent for compliance with cod <br />requirements. If a site suitable for a standard trench drainfield exists on the site, trenches would <br />be allowed. <br />• Defining ''unsatisfactory'* operation <br />According to State standards which the City adopted in February’ 1992, the Rasmussen’s <br />system is not functioning satisfactorily. This change in definition of wh?r is ’satisfactory ’’ is <br />having a significant impact state-wide, especially in shoreland areas where the DNR has made <br />adoption of the standard mandatory. There is a move underway by various entities to make the <br />Chapter 7080 standarus mandatory state-wide, not just in the shoreland areas. <br />• Establishing water table elevation <br />Neaton ’s letter suggests that Weekman’s observations of mottled soil aie insufficient to <br />establish the ’’actual” water table level. As we all know, water table level fluctuates from year- <br />to-year. from .season-to-season. and the perched water tables in the upper layers of soil fiuenjate <br />on a daily basis. The "nonconformance " of the system at 2700 White Oak Circle is not only <br />related to the actual free water surface obseiwed in a boring hole on a given day. but the <br />indication by soil mottling and other indicators as to the highest seasonal water table that may <br />exist from time-to-time. <br />If die property owners wish to hire a certified site evaluator to review he site, they are <br />welcome to do so. If the conclusion of their consultant is in disag’cement with that of <br />Weekman. then we would recommend that a soil scientist from the MPt^A be brought in to make <br />a final determination. <br />Options for Council .Action <br />This septic svstem is nonconforming by definition and that status is not something that <br />can be changed by Council action without changing the definition of nonconforming. The City <br />added the MPCA’s 3’ separation requirement to its conformity definitions based on DNR and <br />Mel Counc'l requirements. <br />Council does have the option of extending the deadline for repairs or replacement. Staff <br />has been in contact with DNR. MPCA and Met Council to discuss their positions on an extended <br />time frame. <br />DNR would not oppose a diree to five year grace period for upgrade of shoreland <br />systems which are nonconforming solely due to lack of required separation. Met Council <br />indicates while they have no specific approval jurisdiction tor such a revision they like our one- <br />vear limit and would suggest not extending past three years. MPCA indica.-.. they have no time <br />0 W V-
The URL can be used to link to this page
Your browser does not support the video tag.