My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
01-08-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 12:00:54 PM
Creation date
1/5/2024 11:59:21 AM
Metadata
Text box
ID:
1
Creator:
Christine Lusian
Created:
1/5/2024 11:59 AM
Modified:
1/5/2024 11:59 AM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2359233/Change_Order__3_-_Lift_Station_29_Driveway_Enhancements_Signed.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 10 Date: January 8, 2024 <br />Presenter: Adam Edwards <br />Presenter: City Administrator / Engineer <br />Section:Consent Agenda <br /> <br /> <br />Title: Tonkawa Forcemain Change Order #3 (22-021) <br /> <br />1.Purpose: <br />The purpose of this council action is to formally approve Change order #3 for the Tonkawa <br />Forcemain Project. <br />2.Background: <br />In January of 2022 Council approved the design of the Tonkawa Force Main replacement project. <br />The project was awarded on July 10, 2023 to Bituminous Roadways, Inc. change Orders 1 and 2 <br />were approved in September of 2023. During the work around the force main it was determined <br />that site conditions warranted a long term fix for the site that included stormwater/ drainage <br />improvements. The work was substantially competed in November. Punch list and final <br />restorations will be completed in the early summer. <br />3.Scope: <br />The Scope of Work for change order #3 includes additional work required to repave and improve <br />the site drainage of the access way to lift station #29 <br />4.Cost: <br />Change order #3 costs $14,624.00 <br />5.Funding: <br />Funding is provided by the Sewer Fund. <br />6.Staff Recommendation: <br />I recommend approval. The work has been completed as proposed. <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to approve change order #3 for the Tonkawa Forcemain Replacement Project in an amount of <br />$14,624 <br />Exhibits <br />A - Change Order #3 - Lift Station 29 Driveway Enhancements_Signed <br />72
The URL can be used to link to this page
Your browser does not support the video tag.