My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
12-12-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 11:33:42 AM
Creation date
1/4/2024 11:30:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F.-2 <br />th^n 5 minutes per inch* The alJowoblo percolation rates also depend upon <br />the slope of the original ground surface. A table of these relationslups <br />is presented on page E-8. It should be noted that mound construction be <br />gins with the 12-inch layer of clean sand upon which the rock is placed. <br />I <br />( <br />The design material presented in section E of this Manual suggests a <br />possible "cookbook** approach and is intended ^o deal primarily with mounds <br />or **berms** for single family residences, or rally sewage flow rates of no <br />more than 1,200 gallons. A flow of 1,200 gallons per day can be treated <br />with a rock bed 10 feet wide by 100 feet long in a properly constructed <br />mound or "berm.** However, the proper hydraulic operation of a mound depends <br />upon lateral as well as vertical seepage. While there is little doubt that <br />rock beds wider than 10 feet will operate satisfactorily on some soils as <br />far as flow hydraulics is concerned, a careful analysis must be made of the <br />ground slope and soil permeability underlying the clean sand layer of the <br />mound. <br />A vertical separation of at least 3 feet is required between the bottom of <br />the rock bed and any restricting layer in order to maintain aerobic condi <br />tions in the clean sand under the rock layer. (Mien consolidated impermeable <br />bedrock is present tiie vertical separation distance is 7 feet.) When aerobic <br />conditions exist in the clean sand, the long-term acceptance rate will be 1.2 <br />gallons per day per square foot. If the depth to the restricting layer is <br />inadequate or the rock bed is too wide, anaerobic conditions may exist and <br />cause a much slower acceptance rate. To evaluate the possibility of anaerobic <br />conditions and the subsequent hydraulic failure is the major design problem <br />when sizing mounds larger than those required for single family residences. <br />Thus, the design criteria of section E cannot be simply multiplied by a scale <br />factor and expected to properly treat larger tlows. The hydraulics of lateral <br />and vertical movement in the clean sand layer and the soil under the elevated <br />rock bed must be carefully analyzed to ascertain that anaerobic conditions <br />will not exist. Thus, both lateral and horizontal permeabilities of the under <br />lying soil layers must be utilized to analyze the flow regime to estimate the <br />height of the saturated zone. <br />Inhere heavy clay soils with slow permeabilities and high seasonal saturated <br />conditions generally exist over an area, it is far better to utilize mounds <br />for one or two single family residences than to collect the effluent from <br />many residences than attempt to dispose and treat it at a single location. <br />The flow hydraulics in clay soils will require cither large depths of fill, <br />or underdrainage, or both, in order to design a proper sewage treatment system <br />to prevent anaerobic conditions under the rock layer. As an example, a mound <br />designed to treat 450 gallons per day may function very well under certain <br />clay soil conditions:, while a single mound serving 5 or 10 residences will <br />fail hydraulically if constructed according to tlic same vertical separation <br />specifications. <br />Proper construction practices for mounds are extremely important but when <br />carefully followed will produce a sewage treatment system tlint will function <br />effectively on a long-term basis. There are an estimated 5,000 single family <br />mounds successfully treating sewage in Minnesota. Many Minnesota counties <br />have found that properly designed and constructed mounds or **beT*ms** are an <br />effective method of sewage treatment and accept them ns a standard system. <br />• • <br />( <br />« AM SM • 11« ,
The URL can be used to link to this page
Your browser does not support the video tag.