My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
12-12-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 11:33:42 AM
Creation date
1/4/2024 11:30:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1236 <br />December 17, 1987 <br />Page 3 of 3 <br />General Directions to Applicant *- <br />1. If the Morgart property is to be included within the formal <br />subdivision application, this inclusion would require rezoning and a <br />Comprehensive Plan amendment. <br />2. A future connection from Garden Lane to Wildhurst Trail should not <br />be through the platted right-of-way of Highview Lane but should extend <br />northward as shown in the Engineer's Sketch. Highview Lane would be <br />vacated and a realignment of the lots required. Applicant would now <br />include vacation of public road within the formal application. If the <br />10' alley along the Palmer and Valek property is planned, include all <br />vacations under one application. <br />3. Sanite\ry sewer capacity to be determined within one month by the <br />engineering staff. It would appear that there is adequate capacity in <br />three of the four lift stations. Formal application must include a <br />petition for extension of sanitary sewer to serve lots within plat. A <br />trunk sewer charge will be determined for the property. <br />4. Storm sewer will be required to direct drainage away from current <br />drainage path via ravene to Wildhurst Trail and re-directed to the <br />wetlands to the northeast. <br />5. Extension of right-of-way for Highview Lane at the northwest edge <br />of the property to be extended along north lot line of Lot 1 for 30' <br />width. If there is to be a future access to the north, this would be <br />determined at the time of preliminary plat review. <br />6. Based on Section 10.03, Subdivision 6 (A) 1, already platted Lots <br />1 through 4 do not require variances to current LR-lB standard and <br />meet 80% of the required lot width. <br />7. All roads within the plat, either already defined as public roads <br />or that loop and carry sewer lines, will qualify for public road <br />maintenance. <br />8. One designated wetland, l.^cated within boundaries of Lot 6, 7 and <br />within the newly defined Valek homestead lot, must be designated as <br />drainage easements. Storm sewer must also be shown as drainage <br />easements with a minimum width of 20'. <br />9. The City will ask for 2' contours of all property included within <br />formal plat application. New road right-of-way to be shown at 50' <br />width. <br />The applicant has 90 days to file a formal subdivision application <br />with the City. If there are any delays, the applicant should advise the <br />City in writing 2 weeks before the deadline date (March 21, 1988).
The URL can be used to link to this page
Your browser does not support the video tag.