My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
12-12-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 11:33:42 AM
Creation date
1/4/2024 11:30:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROM: <br />DATE: <br />SDBJ: <br />Mark Bernhardsonr City Administrator <br />John R, Gerhardson, Public Works Coordinator <br />June 25, 1987 <br />Proposed Garage - Jrono Golf Course <br />Recently the City approved the "Knoll Manor" subdivision, <br />I have been advised that there is a 24' x 36' garage on the <br />propert” that subdividers would like to dispose of and has <br />offered the building to the City of Orono at no charge if the <br />City would move the building off the property. <br />Because we are short of equipment storage at the Orono Golf <br />Course, I have researched the feasibility and costs for moving <br />the building to the golf course. <br />I have inspected the building and have determined that it is in <br />excellent condition and is of the design that will blend in at <br />the golf course. It is three times the size of the current <br />garage/shop and will house the equipment that now must be left <br />outside exposed to the elements and possible vandalism. <br />I have checked with a building mover and have been informed that <br />the building can be moved to the golf course for $2,900 if the <br />City will provide police escorts. <br />I have talked with a contractor and have been told that a <br />floating concrete slab of this size would cost $2,000 - $2,500. <br />There would also be clearing and preparation of the site which <br />could amount to $1,500. Other incidental costs for electrical <br />wiring, moving the furnace and removal of the existing one stall <br />garage could cost $2,000. <br />I estimate the total costs to be $8,900. In 1987 we did budget <br />$5,000 to add on to the existing one stall garage. <br />TO: Mayor Grabek & Council Members <br />FROM; Mark E. Bernhardson, City Administrator^ <br />« <br />Forwarded recommending approval with the $3,000 increase in budget ex <br />penditure will result in long term operational savings through reduced <br />equipment maintenance and repair and upkeep to the existing structure. <br />PROPOSED MOTION: Moved by _, seconded by _, that the Orono City Council <br />approves expenditure of $8,900 for moving of an existing garage and related <br />costs for utilization at the golf course. Ayes , Nays
The URL can be used to link to this page
Your browser does not support the video tag.