My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
10-19-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 1:58:51 PM
Creation date
1/3/2024 1:53:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■rlT.' <br />City of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />1397NO. <br />5 - At this approval time all uses proposed by the church <br />appear consistent with Ordinance 34.022 and the intent <br />of the RR-lB, Rural Residential Zoning District. <br />6 -Per Ordinance 38.305 parking requirements are as follows: <br />total 372 seats at 1 stall per 4 seats = 93 <br />Site plan revised date July 28, 1982, shows 94. <br />7 -The parking lot designating 60° angled stalls shows <br />a minimum driveway aisle width of 17' providing a total <br />north/south width of 112',* minimum north/south width <br />required is 110'. <br />8 -Access width of 28' at Old Crystal Bay Road is consistent <br />v/ith rural access standards for the Citv. <br />9 -The turnaround providing a 48 <br />emergency vehicles. <br />radius will facilitate <br />10 -Per Ordinance 32.430, the applicant has submitted a total <br />landscape plan dated June 1, 1982, to be completed by <br />the year 1984. <br />11 -A single indentification sign 4' x 4' will be located <br />10' off Old Crystal Bay Road right of way per site <br />plan revised date July 28, 1982. <br />12 -All traffic flow, stop and fire lane sign locations will <br />be selected by staff to insure optimum level of safety. <br />13 -The "first stage" church building's needs can be served <br />by an on site well. The applicant is fully aware that <br />future, proposed expansions of the church structure will <br />require a sprinkler system and given the present water <br />supply system will require a large reserviour/holding <br />tank on the property. <br />14 -At some future date when the water capacity in the area <br />has been increased, the church may petition the City <br />for service. <br />15 -The proposed church use is in complete accord with the <br />intent and objectives of the Orono Zoning Code and <br />the City's Comprehensive Land Use Plan. <br />Paoe 2 of 7
The URL can be used to link to this page
Your browser does not support the video tag.