My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
10-19-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 1:58:51 PM
Creation date
1/3/2024 1:53:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m I Bonestroo <br />^=m l^osene <br />Anderlfk & <br />\\\\ Associates <br />Engineers & Architects <br />October 12, 1987 <br />Ono G Bor>etrroa PE <br />Robert W Rosene. PE <br />Joseph C. Anderlik, PE <br />Bradford A Lemberg, f E <br />R<hjrd E Turner, PE <br />James C Olson. PE <br />Glenn R Cook. PE <br />Trvxnas E Noyes, PE <br />Robert G S<r»unichi. PE <br />Marvin L <br />Keith A Gordon. PE <br />Richard W Poster. PE <br />Donald C BurgardC PE. <br />Jerry A Bourdon. PE. <br />Mirk A Hanson. PE <br />Ted K Field. PE <br />Michael T Rautrrunn. PE <br />Robert R Pfefferie. PE <br />David O Loskota. PE <br />Thomas W Peterson. PE <br />Michael C. lyrKh. PE <br />James R Maland. PE. <br />Kenr^eih P Anderson. PE <br />Keith A Bachmann. PE <br />Mark R Boih. PE <br />Robert C. Russek. AIA <br />TfKimas £ Angus. PE <br />Howard A Sanford. PE <br />OCT I 3 B8T <br />Charles A. Erickson <br />Leo M Paweisky <br />Harlan M Olson <br />Susari M Eberlin <br />Mark A Seip <br />city of Orono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn: Jeanne Mabusth <br />Re: 1^139-1216 <br />Winslow <br />1595 Bohns Pt.Rd. <br />Dear Jeanne: <br />We have reviewed the application fron Mr. & Mrs Winslow at 1595 Bohns Point <br />Road for pond construction. The pouu will be located in a designated wetland <br />area. The area to be excavated is approximately 25 percent of t'le wetland. <br />The pond construction will improve the sedimentation capacity available and <br />wildlife habitat. The construction will reduce the assimalation capacity of <br />the marsh slightly. The pond is proposed to be 12 feet deep with 3:1 slopes. <br />The proposed depth tf the pond will help to minimize alga growth and pond <br />odors. <br />The construction operations would result in some erosion problems so silt <br />fence should be required near the pond outlet. The propo.sed construction <br />would not appear to have any long term adverse effects on Lake Minnetonka. <br />If vou have anv questions, please contact this office. <br />Yours very truly. <br />BONFSTROO, ROSKN’E, ANDERLIK 6 ASSOCIATES, INC. <br />Glenn R. Cook <br />GRC/jo <br />Enclosure <br />7l93e <br />2335 West Highway 36 • St. Paul. Minnesota 55113 • 612-636^00
The URL can be used to link to this page
Your browser does not support the video tag.