Laserfiche WebLink
IV.',,,i,. .. * -- - -- -. I i:\^Ai; h\i m z 01981 ;•0L i-: ‘^iTV (:|- OimO••I1920 Fagerness Point Road Wayzata, Minnesota S5391 August 19, 1981 <br />Ms. Jeanne Mabusth <br />Zoning Administrator <br />City of Orono <br />P. 0. Box 66 <br />Crystal Bay, MN 55323 <br />Dear Ms. Mabusth: <br />This is to request permission to leave our existing 2-car garage inplace until <br />construction has been completed on our proposed garage addition to our home. In <br />lack of having a basement in our home, th? existing garage provides a sheltered <br />storage area that has become invaluable to us. The overlapping schedule in the <br />proposed construction of the new addition, and the removal of the existing struc <br />ture, would relieve a hardship allowing us protection of our stored property. <br />The existing garage would be removed upon completion of the new structure. The <br />age and condition of the existing garage, combined with the close proximity to <br />the new addition, further warrant the existing garage removal. In addition to <br />the obvious goal of aesthetics, our goal in the addition proposal is to make <br />better use of our lot. The removal of the existing garage, and sodding of the <br />area outside of the proposed construction, will provide us with much needed <br />additional yard. <br />In conclusion, we request that the City of Orono allow the existing structure <br />to remain inplace until after completion of the proposed addition, and that the <br />city be assured of its removal/destruction at that time. <br />Sincerely, <br />Bruce C. Curtiss