My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1993 Council Minutes HRA2
Orono
>
Advisory Boards
>
HRA
>
1993
>
06-28-1993 Council Minutes HRA2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 9:14:43 AM
Creation date
1/2/2024 9:14:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AM DOCUMENT C701/CM <br />piiQirpT. Orono City H^il ^nd <br />(o.n»,addrejsl Public Works Buildings <br />Crystal Bay, MN 55323 <br />TO (Contractor): <br />LaForce Hardware and <br />Manufacturing <br />1060 West Mason Street <br />Green Bay, WI 54303 <br />QV <br />Distribution to: <br />OWNER O <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER O <br />CHANCE ORDER NUMBER: Three ( 3 ) <br />INITIATION DATE: <br />ARCHITECT'S PROJECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: , , „ ^Hollow Metal, Wood <br />CONTRACT FOR Doors ^ Finish Hdwr. <br />CO.'ITRACT DATE: May 11, 1992 <br />of item »3 <br />on Change Order No. 2. Amount was previously <br />included with revisions to Proposal Request No. 6. <br />2. Add to contract for revisions to locltsets as <br />noted in Proposal Request No. 30. <br />3. Add to contract for furnishing new tracJc and <br />doors for bi”fold door opening B114A. <br />Add $ 385.00 <br />Add: $ 935.00 6-^iC <br />Add: $ 750.00 . <br />Total Add: $2,070.00 <br />35.465.00 <br />6,590.00 . <br />42.055.00 . <br />Th« orifinal (Contract Sum) (Guaranteed Maximum Cost) was ........................................... S <br />Net change by previously authoriaed Change Orders .......«1.#. • 2...................................... » <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ............... S <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order ............................................................................. * • -----: <br />The new (Contract Sum) (Guaranteed Ditaximum Cost) including this Change Order will be ... J <br />The Contract Time will be (increased) (decreased) (unchanged) by . De'^ember 31, 1992 <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />2,070.00 <br />44,125.00 <br />Recommended: <br />Kraus-Anderson Construction Company <br />CONSTRUCTION MANAGER , , . ^ , <br />Minneapolis, MN 55404______________ <br />AOORI <br />Approved: <br />Boaifnan Kroo:. Pfister and Associates <br />DATE <br />Agreed <br />XjaForce_JHardware_and_Maitu^^£jturijn2 <br />CONTRACTOR <br />Green Bav, WI >^4303'''^ - - --------SiSi------Y. ... J99JOO..SS <br />toATE BV <br />Authorized: <br />City of Orono <br />OWNER <br />Crystal Bay, MN 55323 <br />DATE <br />AIA CAUTION: should elBn an orlQlnsI AIA document which hse Ihle caution printed In <br />An original aeeuret Ihsi changee will not bo obscured ae may occur when documonte are reproducod. <br />niAMMT amUtM • CMANCt OtOIt • CONSTRUCTION MANAClMfhBT lOlTlQN e |UN| ^^TlQN •.wlwTi r Niw Yoxx avinui nw . wasmincton . dc . x»s C7f1/CM~T
The URL can be used to link to this page
Your browser does not support the video tag.