Laserfiche WebLink
Sewer/Water Memo <br />May 27, 1993 <br />Page 4 <br />If the Council finds that this lot is buildable. the sewer connection charge payable with <br />llie building permit is as follows: <br />S 225.00 - plant charge <br />191.50 - lift station tt6 by-pass charge <br />1 238.50 - lift station ttl force main charge <br />$1,655.00 total due with building permit <br />Brief Zoning History <br />The "Casco Point District" was established in 1950, containing no regulations regarding <br />lot size for existing lots. Ordinance #22 adopted in 1959 established a minimum budding lo <br />inferred that substandard lots in common ownership could not be granted variances. <br />Tlie 1967 Zoning Code included the Casco Point area as "R-ID". requiring 1/2 acre ^ea <br />and 100 ’ width. Those standards remained in affect when the designation was changed to LR- <br />IC in 1975. <br />ConcIusk)n <br />Council is reminded that no variance review was conducted at the time of assessment <br />determine actual buildability of the lot. <br />If the lot is determined by Council to be buildable. sewer and water co^ctions are <br />feasible although stubs ate not in place and would have to be installed by the owner s contractor. <br />Connection charges which would be due and payable at the time a building pemit is issue <br />would be $1,877 for water and $1,655 for sewer (based on permit issuance in 1993), <br />ch