My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-1993 Council Packet
Orono
>
City Council
>
1993
>
06-14-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:36:46 PM
Creation date
12/29/2023 2:31:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer/Water Memo <br />May 27. 1993 <br />Pace 2 <br />\N’ater Assessment <br />The following is a table defining how Lois 16 through 19 were assessed for water. <br />WATHR 1971 - LW-l <br />Plat 43300 <br />Parcel: <br />0500 <br />Assessed <br />Ownership as of 1974 <br />(■earliest tax record available <br />Lot 16 6070 Units Tuthill <br />Separate Tax Parcel <br />Lot 17 0550 5571 Unit Tuthill <br />Separate Tax Parcel <br />♦Lot 18 0600 5570 Units Tuthill <br />Separate Tax Parcel <br />Lot 19 0650 55’/l Unit Remien <br />Separate Tax Parcel <br />At the time City water was installed, all properties were assessed a footage charge of <br />$5.80 per front foot (Utt 18 was assessed $319). Only those lots with existing residence's or <br />those which were thought tt> be buildable were assessed a unit charge of $580 per unit, .jlaff <br />has found no documentation to-date as to the detail of this attempt to determine buildability of <br />vacant lots as part of this assessment; however. City Clerk Dorothy Hallin indicates that those <br />lots thought to be buildable were assessed a unit. <br />The placement of water stubs clearly reflected Mr. Tulhill s common ownership of Lots <br />16-17-18. Only one stub was installed for the three lots, and "connector arrows were placed <br />on the as-built drawing to reflect TuthilTs ownership. <br />As it currently stands, a water unit has not been assessed to Lot 18. A water stub has <br />not been provided. Front footage has been paid. If the City determines that the lot is buildable. <br />the current water unit connection charge is $1,877 per unit which would luive to be paid as part <br />of the building pennit. Further, the owner would have to pay ail costs of connection to the <br />water main, which is across Casco Point Road from the lot. A new stub-in can be created <br />relatively easily by the owner’s contractor. <br />Please .see the water system as-built and copy ol assessment roll attached.
The URL can be used to link to this page
Your browser does not support the video tag.