Laserfiche WebLink
- - <br />y* <br />U' <br />► ■ ’■ <br />■r- . <br />RtOIARO J. OUNLAP, PRtSIPCtir <br />HAROLD NELSON. VICE PRESIDENT <br />Employee Benefit Plans, Inc. <br />«U MIDWEST PLAZA BUILOINQ • THE MALL • MINNEAPOLIS. MINNESOTA SS402 • TELEPHONt (»I3I IM-S6M ^ <br />December 7, 1973 <br />James W. Cosby <br />Village Administrator <br />Box 66 <br />Crystal Bay, Minnesota 55323 <br />Dear Sir: <br />On November 30, I received a letter from Mike Scheller requesUng <br />that I apply for a permit for the pond constructed on my lot with Mr, <br />Scheller's verbal assurance. Since Mr. Winchell (who is adjoining) <br />and I have the same problem we had already determined that I would <br />do the legal Investigation required for both of us by the rather complex <br />situation. I enclose a preliminary letter from our attorney on the <br />subject. <br />Mr, Winchell and I selected Ed Montgomery to delve into this for us <br />because of his forty some years of experience with Municipal Zoning. <br />For many years Mr. Montgomery was the city attorney for St. Louis <br />Park and has been and is connected in a similar capacity with several <br />smaller villap#*3. <br />Even though Mr. Montgomery has spent considerable time going over <br />the Orono ordinances, I am sure that he doesn't feel the invesitgation <br />has been as complete as it should be, particularily in view of the fact <br />that there could be civil liability involved. An in depth examination <br />would require the examination of council minutes and other research <br />that neither Mr, Montgomery or Mr. Winchell or myself have had time <br />for. <br />E 'en though Mr. Winchell and I wish to cooperate in every way with <br />th' council, we must beg for an extension of time as required m Mr. <br />Scheller's letter for the following reasons: <br />1. The technical requirements set out in the application form <br />could not be completed within the time span set out under <br />the letter. <br />i <br />j