Laserfiche WebLink
September 4,l986 <br />fl/pen <br />Landscape <br />lac <br />P.O. Box 422 <br />Long Lako. MN <br />563M <br />012/473^767 <br />PROPOSAL FOR LANDSCAPE CONSTRUCTION <br />• Submitted TP: <br />Paul Vitko <br />80 Cygent Pi. <br />Orono, MN 55356 <br />DESCRIPTION <br />A.% <br />A <br />B. <br />C. <br />With sandy pit run fill. 525 tons. <br />Grading with Bob cat and labor. <br />Trim trees and remove brush. <br />PRICE: ’ <br />$3495.00 <br />$360.00 <br />75.00 <br />Total projected cost $3930.00 <br />D. Black dirt, approximately 2000 sq. ft. @ 4" depth <br />graded out.(pond only) $450.00 <br />Any additional pit run fill, if needed,$6.65 per ton <br />delivered. <br />J <br />3 <br />t <br />f ■ <br />Excellence • Quality • Value • Service