My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
06-15-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:48:09 PM
Creation date
12/28/2023 2:44:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL SUBMineO TO <br />Mr. Willard L. Bury <br />PHONE OATt <br />June 30, 1986 <br />STREET <br />2695 Casco Point Road <br />JOB NAME <br />CITY. STATE AND ZIP CODE <br />Orono, Minnesota 55391 <br />JOP cOCAliON <br />ARCHITCCT DATt or PLANS JOB PHONE <br />M <br />:Jru;uiiiaI Page No.Pages <br />IDWEST <br />SPHALT <br />ORPORATION <br />ASteClAMb <br />6401 Industrial Drive, Bo* 338 Hopkins. Minnesota 6534j <br />612 934 7700 <br />COntiiiCIOlS <br />lilt • ) <br />Dear Bill: <br />We are pleased to quote on the two driveway pads you want installed in your <br />drive at the above address. We will excavate the existing grade to 6 inches, and <br />add 4 inches of crushed rock base and 2 inches of 2341 asphalt wearing course. <br />These will be 100 feet long and 24 inches wide placed at your direction. <br />We would anticipate doing this work in the early summer of 1987 after settle <br />ment has taken place on the fill Installed in 1986. <br />Total cost for the above work is $650.00 payable upon completion. <br />Thanking you for the opportunity of quoting, I remain, <br />Very truly yours. <br />MIDWEST ASPHALT CORPORATION <br />Richard B. Bury, P.E. <br />President <br />X <br />Bip hereby to furnish material and labor — complete in accordance with above specifications, for the sum of; <br />Payment to be maOe as follows: <br />dollars ($ <br />> <br />All m«t»fial t% fuarantMd to bt as tpecilied All bt compi«:ed m «i workmantiiie <br />m«nn«f accordiof to %tao4«rd proctK*% Any «ltfr«t>on or deviation from «t:w ipecifttA <br />tioni involvtng titra costs wilt be eiccuted only upon written orders end will tecorne jn <br />txtra chorgo owtr « %d above the tstim«tc Alt agreements contingent upon strikes, accidents <br />Of delays beyond our control. Owner to carry fire, tornedo aru) other necessary msurar«ce <br />Ouf wortiers art fully covered by Workmen's Compensation insurance <br />Au?hon/cd <br />Signature . <br />Note: This prcposal 'nay be <br />withdrawn by us •! not accepted within days <br />f Pyttllttf IP of ^rO|IO0{li — The above prices, specifications <br />and conditions art satisfactory and are hereby accepted. You are authonred <br />to do the wofit js specified. Payment will be made as outlined above. <br />Dote of AcceptarKe: <br />Sigriatufe <br />Signature <br />• fr <br />K ■'TW!
The URL can be used to link to this page
Your browser does not support the video tag.