My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-18-1987 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1987 Planning Packets
>
05-18-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:09:14 AM
Creation date
12/28/2023 11:03:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veterans Camp <br />May 14, 1987 <br />Page 2 of 2 <br />:or <br />V, Laundry Facility <br />If people are at the island for 2 weeks, they will probably want to do <br />laundry. . . Design Flow Rate is 690 gpd/machine which would, under a <br />45 — 60 mpi perc rate, need a 1,500 s.f, drainfield for one machine, <br />using up an area about 40'xl00'. - - <br />These are only basic guidelines for various uses. The Design Flow <br />Rates are from the attached "MPCA estimates". I assumed that the soils <br />are capable of handling standard trench systems, but relatively slow perc <br />rates through the Hayden loam soils mapped on the island. Actual system <br />design and area needs will be quite variable based on the types and <br />intensity of use the island ultimately is subject to. Of course, we would <br />expect full soil testing and system design work be done by the applicants <br />for any new systems to be constructed. It remains to be determined whether <br />existing system on the island are suitable for continued usage. . . <br />et iper <br />k <br />need <br />s.f* <br />» 250 <br />perc <br />bout <br />-v. <br />fM- <br />m
The URL can be used to link to this page
Your browser does not support the video tag.