Laserfiche WebLink
Veterans Camp <br />May 14, 1987 <br />Page 2 of 2 <br />V. Laundry Facility <br />If people are at the island for 2 ;veeks, they will probably want to do <br />laundry. . . Design Plow Rate is 690 gpd/machine which would, under a <br />45-60 mpi perc rate, need a 1,500 s.f, drainfield for one machine, <br />using up an area about 40'xl00'. <br />These are only basic guidelines for various uses. The Design Plow <br />Rates are from the attached "MPCA estimates". I assumed that the soils <br />are capable of handling standard trench systems, but relatively slow perc <br />rates through the Hayden loam soils mapped on the island. Actual system <br />design and area needs will be quite variable based on the types and <br />intensity of use the island ultimately is subject to. Of course, we would <br />expect full soil testing and system design work be done by the applicants <br />for any new systems to be constructed. It remains to be determined whether <br />existing system on the island are suitable for continued usage. . . <br />'1