Laserfiche WebLink
e <br />e <br />[•ViT* <br />i <br />>•mtxt <br />.s <br />1 mtT«i <br />IS <br />It <br />ly <br />separate exterior entry is acceptable but it should not <br />appear as a second main entrance, and the primary functional <br />access should be within the residence. <br />d) Lot area is not necessarily a concern as long as: <br />1) Septic needs are met. <br />2) Parking reqquirements are handled. <br />The concept that the guest apartment requires the lot to be <br />double the zoning district's required area is not valid. <br />e) Conditional Use Permit review process should address: <br />1) Septic <br />2) Parking <br />3) Exterior door/Entrance design (aesthetics) <br />4) Interior access (to make sure there is one) <br />f) The inside mechanical set-up is not a concern; however, <br />separate metering of utilities gvenerally will be disallowed. <br />g) Staff will continue to treat permit requests for wet <br />bars, basement "kitchenettes", etc. as before, notifying <br />homeowner that guest apartment use requires a conditional <br />use permit and rental use is prohibited. <br />V