Laserfiche WebLink
1. <br />3. <br />4. <br />o. <br />6. <br />Sreinir,?er ConsirucLion Company <br />Chan-f** Orri<>r ~'2 - Attachment <br />Add to contract for extra cost to raise grades at Cold <br />Storage and Sand/Salt Storage Building as <br />recommended bv soils engineer. <br />Deduct in contract amount for cost sanngs due to <br />less deep excavation required at Cic\' Offices. <br />Add to contract for extra work required to haul in <br />gravel and build temporaiy road on Apnl 20, 1992. <br />work order. <br />Add to contract to excavate black dirt and haul in <br />granular fill over geo tech fabric east of Salt <br />Storage Building. <br />Add to contract to exca\-ate for deeper foundation <br />required for installation of water service. <br />Add to contract for excavadon of holding pond as <br />indicated on PRD drawings. <br />Deduct in contract amount for testing cost <br />overruns due to improper fill material being <br />hauled in. <br />Add: S12.441.00 <br />Deduct: (S 6.SOO.OO) <br />Add: S 1.139.00 <br />Add: S 3.933.00 <br />Add: S 2.012.00 <br />.Add: S 4.000.00 <br />Deduct: 4.000.00) <br />Total Net Add; S12.725.00 <br />4