Laserfiche WebLink
1. <br />2. <br />3. <br />4. <br />5. <br />7. <br />r.^phart Electric Comnanv <br />Change Order #3 - Attachment <br />Furnish additional labor and material necessary <br />for the wiring of motorize damper controls. <br />Furnish additional labor and materials necessary <br />to convert the generator from propane to natural <br />gas. <br />Furnish addidonal labor and materid necessary <br />to m2dce lighting revisions as noted in Proposal <br />Reqiiest No. 23. <br />Furnish additional labor and material necessa^ <br />to make revisions to electrical work as noted in <br />Proposal Request No. 25. <br />Furnish labor and material necessary to relocate <br />emergency generator tap connection from <br />existing facility to new public works garage. <br />Furnish labor and material necessa^ to make <br />revisions to electrical work as noted in Proposal <br />Request No. 30. <br />Furnish additional labor and material necessary <br />to relocate conduits in the council chamber <br />bathroom due to relocadon of parddon and toilet <br />accessories. <br />.Add: S 1,500.00 <br />.Add: S 479.00 <br />Add: $655.00 <br />Add: S 881.00 <br />Add: S <br />• <br />644.00 <br />Add: $ 6.177.00 <br />.Add: S 220.00 <br />Total Add; $10,556.00 1 <br />tim