Laserfiche WebLink
1. <br />3. <br />Jansco Caulking <br />Change Order #3 - Attachment <br />Furnish additional labor and mat' "ial necessary <br />to caulk top of walls in police holHir^ cells, joints <br />at door frames where they meet vinyl wall <br />covering and at oudet covers as directed by Job <br />superintenden t. <br />Furnish additional labor and material necessary <br />to caulk control joints in quarry tile floors and <br />ceramic tile at toilet rooms. <br />Furnish additional labor and material necessary <br />to caulk top of walls in public works and at joints <br />between steel bents and masonry as noted in <br />punch list. <br />Add: $230.50 <br />Add: $265.00 <br />Add: S270.00 <br />Total Add: $765.50 <br />J