My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-1993 Council Minutes2
Orono
>
City Council
>
1993
>
05-24-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 12:12:45 PM
Creation date
12/26/2023 12:08:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It is estinated that for 1991, 33% of th« total flow was I/I» <br />costing the City an estimated $90,000 in excess MWCC treatment <br />charges. <br />In order to further reduce I/I in a cost-effective manner, <br />the City will embark on an accelerated program to identify and <br />eliminate I/I sources, including the following* <br />1* Review and update the 1981 I/I analysis. The update <br />will include not only additional analysis of those areas <br />studied in 1981, but will analyse flow data from all <br />currently existing portions of the system not covered in <br />that study. <br />2. As part of this update, each City-owned lift station <br />will be analysed as to the extent of its service area, and <br />past flow data will be compared with expected flows in <br />order to identify and isolate any existing I/I sources. <br />3. Flow data from City-owned lift stations will then <br />continue to be collected and analysed on a quarterly basis <br />to quickly identify and eliminate any new sources of I/I <br />that may occur. <br />4. Continuation of current system rehabilitation program <br />as funding permits. <br />5. Immediate initiation of a public education program <br />regarding the need to eliminate illegal connections. <br />€. Adoption of ordinances whic i provide for penalty for <br />illegal connections of sump pumps and foundation drains to <br />the snanicipal sewer system, supported by a proactive program <br />of visual Inspection of residential connections, starting in <br />areas where system analysis indicates the greatest <br />likelihood that flow reduction can be accomplished. <br />19-A <br />I
The URL can be used to link to this page
Your browser does not support the video tag.