My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-1993 Council Minutes2
Orono
>
City Council
>
1993
>
05-24-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 12:12:45 PM
Creation date
12/26/2023 12:08:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NINUTES OF A REGULAR ORONO COUNCIL MEETING <br />HELD MAY 10. 1993 <br />BIKE TRAIL - CONT. <br />K«M«y said ha would like to have a commitment from Hennepin Parks <br />that the trees wiIi be planted this falI. <br />Flint said the Park Commission feels It will take much longer than <br />two weeks to do the plan Including the trees. In part because there <br />is only 2’ available in which to plant trees. That is not enough <br />room to plant trees In and the City will have to work with every <br />property along the trail. He proposed they stake out the entire <br />trail and then write a letter to everyone requesting a meeting to <br />work with them regarding reolantings. <br />Qoetten understood that the Silver View area is where the residents <br />had real concerns. She agreed that the entire process would ^Ake <br />longer, but urged the Park Commission to begin the process with <br />the that owners Immediately as they have not heard from anyone. <br />Hurr agreed that they need to talk to everyone along the trail. <br />Kelley felt the leverage was now. He said he did not want to commit <br />to th# projoct until he was aware of the entire scope of It. <br />Jabbour questioned the contract with Hennepin Parks. <br />Flint stated the drafting errors Included In the contract have not <br />been corrected. <br />Cook noted at any time the bids can be rejected. <br />Mayor Callahan clarified that the Council Is unwilling to approve <br />the bids until they are satisfied with the landscaping and the <br />trees. All members agreed. He agreed that sending the bids out does <br />not commit to anything. <br />Hurr agreed and felt they should begin the process. <br />Cook stated It would be six weeks before they would be ready to <br />approve the bids. <br />Hurr felt that residents would,still have time tor input and would <br />not feel as though the project has been finalized. <br />Moorse asked how the project would be funded. <br />Mayor Callahan stated the expected source of funds was the highway <br />funds.
The URL can be used to link to this page
Your browser does not support the video tag.