Laserfiche WebLink
Exhibit A <br />License No. <br />Page 2 <br />III. DOCK LAYOUT (reference Exhibits B and C attached) <br />Maximum authorized length of main dock 2(X) feet. <br />Docks extending beyond 200 feet and docks encroaching into required side yard setbacks are <br />hereby specifically declared to be illegal non-conforming structures which are not permitted <br />under this license. The application does not contain such illegal structures. All such violations <br />are subject to prosecution under Sections 5.42 and 10.41 of the Orono Municipal Code. <br />IV. Marina is not authorized for FUEL SALES subject to compliance with the State Fire Code. <br />V. Required number of OFF-STREET PARKING SPACES per Resolution No. 2674 (see <br />variance noted below). <br />VI. SPECIAL CONDITIONS required for compliance with the ordinances of the City and/or the <br />LMCD. The issuance of this license is subject to full compliance with these conditions. Failure <br />to comply with these conditions is • ause for license revocation and/or prosecution by the City. <br />1.Dock length variance (LMCD Ordinance 3.02 Subdivision (2) (a) <br />Required = 100’ <br />Existing = 200’ <br />Variance = 100’ <br />- Brown Bay Docks. <br />2. <br />3. <br />4. <br />Side setback variance for dock structure on north property line on Browns Bay (LMCD <br />Ordinance 3.02 Subdivision (2) (b) - Refer to Exhibit B. <br />50 ’ - 100’ required = 30’ existing - 20’ variance = 10’ <br />100’ - 200’ required = 40’, existing = 20’, variance = 20’ <br />Side setback variance for dock structure on south proj^rty line on Tanager Lake (LMCD <br />Ordinance 3.02 Subdivision (2) (b) - Refer to Ei^ibit C. <br />0 - 50 ’ - required 20’, existing = O’, variance 20’ <br />50 ’ - 100’ - required 20’, existing = 2’ variance 18 ’ <br />100’ - 200’ - required 20’, existing - .8 ’. variance 19.2’ <br />Side setback variance for dock structure on north property line on Tanager Lake (LMCD <br />Ordinance 3.02 Subdivision (2) (b) - Refer to Exhibit C. <br />0 - 50 ’ required = 60 ’. existing = O’, variance = 60 ’ <br />50 ’ - 100’ required = 60 ’. existing = 0’ with 4’ overhang, variance * 60 ’ <br />100’ - 200’ required = 60 ’, existing = .3’, variance = 59.7