Laserfiche WebLink
Marina License Memo <br />May 18. 1993 <br />Page 3 <br />attached. This reflects his past practice and has resulted in no complaints. The <br />remaining issue relative to marina reconstruction is paving of the lot directly <br />north of the new building. Mr. Rivers indicates he plans on doing that this <br />summer, and is attempting to work out his drainage problem with the County. <br />The number of lake slips remains at 118 as per past licenses, with no on-land <br />storage of boats for lake use. <br />D. Sailor ’s World <br />After transitioning through a number of owners, this property reverted to the <br />Sailor ’s World partnership of John Vogt. Gary DeSanti.*: and Richie Anderson. <br />They began constru:tion of the clubhouse per the approved plans in early 1992. <br />As of this spring, the clubhouse building is nearing completion and a temporary <br />certificate of occupancy has been issued. The old converted garage building is <br />still being used for storage but will be coming down per the approved site plan. <br />The parking area and landscaping have not been commenced, but staff will be <br />working with the property owners to ensure that happens this summer. <br />The issue of winter boat storage has not been discussed with the marina <br />operators, but their application indicates none is intended. Recall that the 42 <br />defined parking stalls are 6 short of the normally required 48 based on 79 slips. <br />This was approved in Resolution No. 2194. <br />The breakdown for proposed use of the historically approved 79 slips is 1 <br />company owned boat. 4 "club rental boats", and 74 rental slips. Our parking <br />code to-date does not address a different parking rate for boat club slips than it <br />does for standard rental slips (6 parking spaces per 10 slips). <br />For the record, the City’s approval of the site plan was partially based on the fact <br />that no boat sales would cKcur at this marina, and the clubhouse design reflects <br />that fact. <br />Staff and the marina operators plan on meeting Monday, May 24th to tie down <br />a timeframe for completion of the construction, demolition, landscaping and <br />paving. Ab.sent that di.scussion as of this writing, staff has drafted the license to <br />be conditioned tm landscaping and site work completion by September 1. 1993. <br />The letter of credit for this project e.xpires March 13, 1994.