My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-1993 Council Minutes2
Orono
>
City Council
>
Minutes
>
Historical
>
1990-1999
>
1993
>
05-24-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 12:12:45 PM
Creation date
12/26/2023 12:08:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />MINUTES OF A REGULAR ORONO COUNCIL MEETING <br />HELD MAY 24, 1993 <br />ROLL <br />The Council met on the above date with the following members <br />present- Mayor Edward Callahan, CouncIImembers J. Diann Goetten, <br />Gabriel Jabbour, Charles Kelley and JoEllen Hurr. The following <br />represented the City staff: City Administrator Ron Moorse, Public <br />Works Director John Gerhardson, Police Chief Stephen Sullivan, <br />Assistant Planning and Zoning Administrator Michael Gaffron, City <br />Attorney Kevin Staunton, and City Recorder Teri Naab. Charles Nolan <br />represented the Planning Commission. Mayor Callahan called the <br />meeting to order at 7:38 P.M. <br />(#1) CONSENT AGENDA <br />Moorse removed Items #8 and 22. <br />KeI ley added Item #7. <br />Goetten added Item #20. <br />It was moved by Hurr, seconded by Jabbour, to approve the Consent <br />Agenda as amended. Ayes 5, nays 0. <br />Motions for all items adopted by consent agenda will be included <br />In the minutes in their respective numerical order. <br />(#2) COUNTY ROAD 15 SAFETY IMPROVEMENT UPDATE <br />Pat Murphy, Director of Hennepin County Public Works, and Bruce <br />Polancheck, Planner, were present. <br />Murphy stated he last appeared before the Council with a proposal <br />to either upgrade the 2 lane County Road 15 or do major <br />maintenance. He said he appeared before the City of Minnetonka <br />Beach at the same time. Since that time the County has prepared a <br />complete rebuild concept plan for the highway, which does not show <br />construction limits or impact. The proposal includes the area <br />between Areola Bridge to the Highway 12 connection near Wayzata. <br />He asked the Council to review the plan and provide them with <br />direction. <br />Polancheck explained they propose three types of <br />first Is a typical section with two 12 lanes and 8 shoulders, <br />equaling 40’ paved right-of-way. The second is the typical road <br />section with a continuous left turn lane or two I*] <br />the middle equaling a 54’ right-of-way. The third <br />proposed in fewer areas and includes the typical sect.on wi th both <br />left and right turn lanes and would be a 66’ wide paved right-of- <br />way . <br />1 <br />1 <br />1
The URL can be used to link to this page
Your browser does not support the video tag.