Laserfiche WebLink
1236 <br />Oil ACTIOH <br />otices 12/29/87 <br />er <br />Creek Drive <br />/ MN 55445 <br />cilitate filing <br />included within <br />n. If Morgart <br />i a rezoning and <br />the application <br />Commission held <br />( or roads, this <br />re the regular <br />Monday of each <br />iy platted Lota <br />I standards and <br />&s public roads <br />iblic roads and <br />iries of Lots 6 <br />lot, must be <br />so be shown as <br />Included within <br />e shoffn at 50* <br />ve arrange to <br />s and resolve <br />Zoning File No. 1236 <br />Notice of Planning Commission Action <br />December 29, 1987 <br />Page 2 of 3 <br />A Future Connection From Garden Lane to Wildhurst Trail. <br />Highview Lane would be vacated and a realignment of the lots <br />required per Engineer's sketch. Applicant would now include <br />public road within the formal application. If the <br />10 alley along the Palmer and Valek property is planned, include <br />all vacations under one application. If Morgart property is <br />included, a through road can be realigned and, if not, an <br />extension road can be platted to west boundary of Morgart <br />property and a through road constructed with final develoument of <br />Morgart property. <br />B. Access Corridor to County Road 19 (originally planned via <br />Highview Lane Extension). Once again the topography and existing <br />improvements may suggest a more southern location for future <br />through corridor. Staff will work with you to define best <br />location for through road in relation to planned road realignment <br />to north* <br />C. Sanitary Sewer - Need for Upgrading and Cost to Applicant. <br />Sanitary sewer capacity to be determined within one month by the <br />engineering staff. it would appear that there is adequate <br />capacity in three of the four lift stations. Formal application <br />must include a petition for extension of sanitary sewer to serve <br />lots within plat. A trunk sewer charge will be determined for <br />the property. <br />D. Storm Sewer. Staff to work with applicant to define best <br />location for discharge of dra-’nage to Forest Lake. It is staff's <br />intent to reroute drainage away from current drainageway to <br />southeast and redirect to northeast if easements are available. <br />If this cannot be realized, the current drainageway will have to <br />be upgraded to handle additional flow. <br />1 pertinent fees from the Orono Fee Schedule are <br />listed below. Please contact staff if you have any questions. <br />SUBDIVISION <br />Preliminary Review <br />(Class III and all non-residential)$300.00 +$20/lot 11.10,Subd 10( <br />($360/3 lots; $380/4 lots) <br />Final Plat Review (Class III)$150.00 ^Special Legal/Engineerin <br />Charges 11.10, Subd 17(A)( <br />Piling Pees: a) Plat only $ 75.00 <br />b) Plat + Easements fi Covenants $150!00 11.10, Subd 17(A)( <br />PUBLIC PROPERTY VACATTOW $ 50.00 per Section 10.11 <br />benefitting property <br />($250.00 minimum per <br />application) <br />m <br />•nr ; ■.-■i <br />V l.\ . < . .S <br />% <br />W <br />:---- ^ <br />1 ^ <br />« <br />1 <br />Zoning Fil <br />Notice of <br />December 2 <br />Page 3 of <br />easement V <br />APPLICAT <br />ZONING ame: <br />request to <br />SPECIAL IM] <br />Non-refunc <br />design dra’ <br />are propos <br />Preliminary <br />Proposed <br />Proposed <br />Proposed <br />Proposed <br />(exclud <br />PARK DEDICA <br />Dwelling Un <br />(The greate <br />density or <br />density) <br />acres/d.u. <br />1.00 to 1.9 <br />Key A Sing] <br />buil <br />if V <br />the ( <br />B Sing <br />for < <br />C Dupl <br />subdi'^ <br />is dei <br />art exi <br />Shall <br />permit <br />D Multil <br />subdiv <br />multif <br />E Existi <br />reside <br />Please <br />all interest)