My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
10-03-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 9:55:49 AM
Creation date
12/20/2023 10:40:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•4,niiKfi ll■^illl I W’•«■*^'.«*»<*-*-46 <br />*A ih.«m,.. «ini Tf*—« <br />We inUcipite reUtively low yield from the recowy trench, on the order of one to three t*no« P*' <br />minute. It is likely that the pumping jyjtem will operate intermittently. <br />The recovery sump wUI contain a Jingle MO Volt. l/Jhorsepo«erGrundfossubmeniblepump. Thepump <br />wfll be equipped with on/off floats to compeosate for intermittent pumping. The floats wUl maintam a <br />drawdown water level in the recovery trench of aoproaimately 17.0 feel. The pump win reum <br />eonaminated ground waar to the surface and into an aeratioo sysam for aeatment of dissolved vototile <br />constitYMiits. <br />The aeration sysam will consisl of a MO Volt, three horsepower direct drive blower and two 200 gallon <br />anks in ariei. As water enan into the top of the fiat tank, it is exposed to approximately 350 cubic <br />feet per minua (cfm) of forced air. Water drains from the Hat tank into the second and aceives an <br />additional 350 cfm of forced air. Discharge from the aeond diffusion ank will be diacad to the <br />saniary rower sysam (Figure 5). Discharge approval from the MWCC will be obained prior to <br />insallation. The recovery sump and aeation tanks will be enclosed inside a locked wood security <br />fence. <br />< Hmet>rtry Svafm MftBttfff*"* Smeipllwe <br />Proper system operation win be ensured by regular site visits by Delta personnel. We anticipate that a <br />minimum of two site visits will be made during the initial month of operation. After the initial month, <br />site visits will be conducted every month. <br />Recovery system inHuent and effluent will be sampled immediately after the system begins operaUon. <br />After collection of the initial samples, the system will be shut-off until the results are returned and <br />reviewed by Delta, the MPCA, and the MWCC. The system will be activated after approval has been <br />granted by the MWCC to discharge to the sanitary sewer system. The influent and effluent will be <br />sampled again 30 days after continuous operation begins. Samples will be analyaed for EPA 601/602 <br />parameters. We anticipate that total VOCs discharged to the sanitary sewer system will be less than one <br />part per million (ppm). <br />After the first two rounds of sampling have been completed, we propose quarterly sampling of discharge. <br />We also propose quarterly sampling of wells in the vicinity of the trench system (MW-1, MW-2, MW-2D, <br />MW-6, MW-4, MW-4D. MW-10, MW-11 and MW-12) during the first year of operation. All other wells at <br />the site will be sampled semi-annually. Reports of discharge sampling will be forwarded to the MWCC <br />and the MPCA. Reports of monitoring well sampling will be forwarded to the MPCA for review and <br />ir- <br />-f' <br />IM <br />cornsneni. <br />S.6 Soil Treat <br />We propose to t <br />thinspreading i <br />buildings or is <br />westerly acfOiS <br />feet <br />We anticipate i <br />installation pre <br />excavation. Sai <br />The soil will \n <br />will be aerated <br />Aefition tillag< <br />Soil samples wi <br />we propose san <br />year the sampli <br />to the MPCA I <br />6.1 Soil Sami <br />Soil sampling't <br />barrel sampler <br />inches, the nu <br />penetration re <br />cohesionless sc <br />6.2 SoilClasi <br />As the samples <br />in accordance <br />laboratory for <br />indicating the <br />pertinent infoi
The URL can be used to link to this page
Your browser does not support the video tag.