My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-1988 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1988 Planning Packets
>
10-03-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 9:55:49 AM
Creation date
12/20/2023 10:40:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yl) <br />■ ‘RKanaat.^^■r.y ...ikt ■■''-#l ■.•■«. <br />CSao a ■wfWft « <br />Bonestroo <br />RDsene <br />Anderiik & <br />|\j| Associates <br />linginccrs A Architects <br />mML PchMi W taitt PI.MdlMCliPAPC.MBA A. SMfkM. <br />OonM C. typpiP. PC.jMB • mrnm. PC.mspjiCaMMM.ni <br />A. U jOTyACMtovPI^mnnmp MBrtia vMMh.ra. <br />pr, PiA mwa ^mm A CKfvnonn. PC. <br />Ca OMll. Pi.MC MAPC.MM t. Aolfi PC.UP M. m»iuay <br />Qann 1. CMfe. <*€•MkfiMtT imwiiiiii. PC.MmC lyiM. AIJI.HMtM* M. OtMn <br />ThMi a NeM ai ,teMC.PMMiPl fhoMi C. ArptfL PX Sam Ml maxM, cka . <br />SepCeiid>er 26, 1988) <br />Cit/ of Orono <br />Box 66 <br />Crystal Bay, MH 55323 <br />Attn: Jaanoe Mabusth <br />Re: 139-1327 - Soskin Plat <br />Dear Jeanne: <br />We have reviewed the Soskin Plat on Wildhurst Trail North of County Road 19 <br />The subdivision approval will have to tie into the Yorktown subdivision ap <br />proval as discussed. <br />There is a major drainage way across lots 142. The developer should provide <br />a 50 to 75 foot drainage easement as shovra. In addition 5 foot drainage ease <br />ments are required along all lines. <br />The topography for Wildhurst Trail should be included on the plat. The lo <br />cation of the existing surfacing and elevations are necessary to review the <br />driveway access points. The driveways for lots 647 should be combined be <br />cause of the substandard lot widths. The driveway grades will be rather steep <br />(14-16 percent); but are acceptable. <br />The sanitary sewer services for lots 6,748 will be from Wildhurst Trail. <br />The sanitary sewer line will have to be extended and services placed to the <br />property line. The sanitary sewer s*ui.vlce for lots 1 thru 4 will be from <br />Garden Lane. This sanitary sewer line is planned to be extended as a part of <br />the Yorktown development. <br />There may be some additional street 4 storm sewer work required off the <br />Yorktown development plat as previously discussed. The requirements of that <br />developoient should also apply to this subdivision. <br />If you have any questions, please contact this office. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK 4 ASSOCIATES, INC. <br />Glenn R. Cook <br />GRC:br <br />Highway 36 • St. Paul, Minnesota 55113 • 612-636-4600
The URL can be used to link to this page
Your browser does not support the video tag.