Laserfiche WebLink
itor <br />i. <br />4inlmum <br />Required <br />ore in area. <br />dable land. <br />rV' <br />V. <br />H <br />K <br />t <br />Zoning File #1330 <br />September 13# 1988 <br />Page 2 of 5 <br />4. Road length proposed is 1.000-, proposal is for » ^0 “ut^wi <br />100- cul-de-sac; paved road section is proposed as <br />rather than shoulders). 24- paved width is <br />section 11.33, Subdivision < does <br />than" seven lots being served, 24' for 3 tnrougn o <br />not define for seven lots. . .) <br />5 The road access point onto Townline Road is directly across from a <br />Private road in Independence; sight distance appears to be adequate <br />and has been approved by the Public Works Director. <br />6. This will be a private road, subject to the normal ownership and <br />maintenance covenants. <br />7 Access for Lots 3 and 4 will require crossing Painter's ^^eek; <br />s;afrrecosInds a single shared creek crossing point adjacent to the <br />cul-de-sac# at the shared lot line. <br />8. AS of this writing, the City Engineer has not <br />whether special outlet structures will be required where run off <br />leaves the cul-de-sac area near the creelc. Applicant s surveyor ha_ <br />noted that they are working with the Minnehaha Creek Watershed <br />District regardinc onecifics of this application. <br />B) Buildability; <br />1 Each lot contains at least 1.5 to 2.0 acres with slopes at 6% or <br />flatter. This should allow for development of <br />systems which are anticipated to be necessary on most of the , - <br />to high water table soils. <br />2 soil types on the property, according to the soil survey, include <br />extensive areas mapped as Hamel lo^, “Vbut the Lmel <br />with the Lester often being suitable fo.r trenc es. <br />i<y <br />r * <br />V A <br />5* i^;. .jiSl <br />I <br />Zoning Pile #1330 <br />September 13# 1988 <br />Page 3 of 5 <br />The areas ma] <br />given that I <br />depressions k <br />the topograph <br />very likely <br />Survey). <br />3, Orono C <br />subdivision 1 <br />conditions ai <br />difficult tc <br />property# an< <br />a very high : <br />For this cur <br />soil borings <br />6# both of w; <br />mapped as Hai <br />request this <br />feasible on <br />consultant r< <br />C) Future Road E <br />Staff and t <br />surrounding prop <br />the east or sout <br />neighboring prop <br />density for this <br />connections woulc <br />T» Easements Rea <br />The City wi <br />Flowage Easemen* <br />Easement of a w; <br />Creek in Lots 2# <br />roadway drainage <br />easements 5' in w