Laserfiche WebLink
S OF MY CONSTRUCTION <br />ETTER FROM MY NEAREST <br />OF MY PROPERTY. <br />THE VIEW OF LAKE <br />LIGH ALL OF THESE <br />E FRONT OF MY PREMISES <br />RIANCE APPLICATION, <br />EOMMON SENSE. I <br />STRUCTURES ON MY <br />3 AS TO SETBACK <br />SHOW YOU THAT OTHER <br />5LACE; RATHER, MY <br />/IS MORE OF A MATTER <br />) COMPARE IT TO THE <br />DEVELOPEMENT AND USE <br />:k. <br />:*LAIN MY CONSTRUCTION <br />STRUCTION PLANS, I AM <br />ESTIONS WHICH YOU MAY <br />nON PLANS. <br />ROJECT. WHEN THIS <br />[RIAL WILL BE <br />ID TO AS TREATED). <br />:ONSTRUCTED OUT OF <br />[LLING IS BUILT ON <br />JERS (CUT TO LENGTH), <br />[ADER. THE FRONT <br />(S, TIED TO A SERIES <br />TREATED, 2X8 JOISTS <br />iRE CONECTED TO THE <br />OPERATED BY 16 INCH <br />:ONECTED ATTACHED TO <br />'H REDWOOD LUMBER. <br />:ated next to the <br />>OST SITUATED FIVE <br />• THE DECK LOCATED <br />:TED to the OUTSIDE <br />JICH FORM THE OUTSIDE <br />BUILDING PERMIT PAGE #£ <br />THE FRONT, SECTION OF THIS DECK IS CONSTRUCTED AS FOLLOWS: THERE ARE FIVE <br />4X4 REDWOOD SUPPORT POSTS. TWO WERE PREVIOUSLY MENTIONED AS THE CORNER POSTS <br />OF THE 10 FOOT SIDES. ONE FOOT FROM THE WESTERN SIDE CORNER POST IS ANOTHER <br />4X4 REDWOOD POST. THIS WILL SUPPORT THE RIGHT HAND RAIL AND STEP/ENTRANCE <br />TO THE DECK. THREE FEET EAST OF THAT YOU WILL FIND ANOTHER 4X4 REDWOOD POST <br />WHICH WILL SUPPORT THE LEFT HAND RAIL AND STEP. FIVE FEET FROM THAT POST YOU <br />WILL FIND ANOTHER 4X4 SUPPORT POST. THE LAST 4X4 SUPPORT POST FORMS THE EASTER <br />END OF THE FRONT OF THE DECK. ATTACHED TO THESE SUPPORT POSTS WILL BE ANOTHER <br />2X6 REDWOOD BEAM WHICH WILL FORM THE FRONT OF THE DECK. <br />THE POST AND HEADERS WILL BE CONECTED WITH 5/8 INCH, FOUR INCH LAG SCREWS <br />WHEREVER THEY MEET. THIS DECK WILL BE 15 INCHES ABOVE GRADE, THEREFORE, THERE <br />WILL BE ONE STEP BUILT AT THE FRONT ENTRACE OF THE DECK. <br />THE DECKING ITSELF WILL BE 2X6 RE WOOD DECKING. THE DECKING WILL RUN THE 19*^ <br />FEET OF THE DECK. THESE WILL BE TIED TO THE JOISTS BY 16 PENNY GALVANISED NAILS <br />THERE WILL BE A TOP RAIL SITUATED 36 INCHES ABOVE THE DECKING RUNNING ACROSS <br />THE PERIMETER OF THE DECK. THIS WILL FUTHER ADORNED BY A SERIES OF 2X2 REDWOOD <br />PICKETS, HUNG VERTICALLY, RUNNING COMPLETELY AROUND THE OUTSIDE OF THE DECK. <br />THESE WILL BE SEPERATED BY 6 INCH CENTERS. <br />AGAIN, I HOPE THAT THIS IS ALL THE INFORMATION WHICH YOU WILL NEED FOR THE RAPI. <br />APPROVAL OF A BUILDING (?) VARIANCE AND CONSTRUCTION PERMIT. IF YOU HAVE ANY <br />OTHER (3UESTI0NS, PLEASE DON’T HESITATE TO GIVE ME A CALL—HOME-471-8690; <br />WORK-553-7759. <br />JON W. PAPAS <br />3369 CRYSTAL BAY ROAD <br />ORONO, MN <br />- <br />ri <br />: ^ <br />■ <br />V- H, <br />V V':'A <br />»• <br />W I