My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
09-19-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 9:16:25 AM
Creation date
12/14/2023 1:59:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mm' i. •W'. P" <br />OF MY CONSTRUCTION <br />TER FROM MY NEAREST <br />■ MY PROPERTY. <br />iE VIEU OF LAKE <br />►H ALL OF THESE <br />FRONT OF MY PREMISES <br />ANCE APPLICATION, <br />IMMON SENSE. I <br />■RUCTURES ON MY <br />AS TO SETBACK <br />iHOW YOU THAT OTHER <br />ACE; RATHER, MY <br />IS MORE OF A MATTER <br />COMPARE IT TO THE <br />VELOPEMENT AND USE <br />AIN MY CONSTRUCTION <br />RUCTION PLANS, I AM <br />TIONS WHICH YOU MAY <br />ON PLANS. <br />JECT. WHEN THIS <br />lAL WILL BE <br />TO AS TREATED). <br />NSTRUCTED OUT OF <br />LING IS BUILT ON <br />RS (CUT TO LENGTH), <br />DER. THE FRONT <br />, TIED TO A SERIES <br />REATED, 2X8 JOISTS <br />E CONECTED TO THE <br />ERATED BY 16 INCH <br />NECTED ATTACHED TO <br />REDWOOD LUMBER. <br />TED NEXT TO THE <br />ST SITUATED FIVE <br />THE DECK LOCATED <br />ED TO THE OUTSIDE <br />CH FORM THE OUTSIDE <br />k <br />■■S <br />.*• 1 <br />. *'■ <br />pm <br />iii <br />' <br />m % <br />m lift 11 ifcirTilltf ' <br />BUILDING PERMIT PAGE #2 <br />THE FRONT, SECTION OF THIS DECK IS CONSTRUCTED AS FOLLOWS: THERE ARE FIVE <br />4XA REDWOOD SUPPORT POSTS. TWO WERE PREVIOUSLY MENTIONED AS THE CORNER POSTS <br />OF THE 10 FOOT SIDES. ONE FOOT FROM THE WESTERN SIDE CORNER POST IS ANOTHER <br />4X4 REDWOOD POST. THIS WILL SUPPORT THE RIGHT HAND RAIL AND STEP/ENTRANCE <br />TO THE DECK. THREE FEET EAST OF THAT YOU WILL FIND ANOTHER 4X4 REDWOOD POST <br />WHICH WILL SUPPORT THE LEFT HAND RAIL AND STEP. FIVE FEET FROM THAT POST YOU <br />WILL FIND ANOTHER 4X4 SUPPORT POST. THE LAST 4X4 SUPPORT POST FORMS THE EASTER <br />END OF THE FRONT OF THE DECK. ATTACHED TO THESE SUPPORT POSTS WILL BE ANOTHER <br />2X6 REDWOOD BEAM WHICH WILL FORM THE FRONT OF THE DECK. <br />THE POST AND HEADERS WILL BE CONECTED WITH S/8 INCH, FOUR INCH LAG SCREWS <br />WHEREVER THEY MEET. THIS DECK WILL BE 15 INCHES ABOVE GRADE, THEREFORE, THERE <br />WILL BE ONE STEP BUILT AT THE FRONT ENTRACE OF THE DECK. <br />THE DECKING ITSELF WILL BE 2X6 RE WOOD DECKING. THE DECKING WILL RUN THE 19+ <br />FEET OF THE DECK. THESE WILL BE TIED TO THE JOISTS BY Ifa PENNY GALVANISED NAILS <br />THERE WILL BE A TOP RAIL SITUATED 36 INCHES ABOVE THE DECKING RUNNING ACROSS <br />THE PERIMETER OF THE DECK. THIS WILL FUTHER ADORNED BY A SERIES OF 2X2 REDWOOD <br />PICKETS, HUNG VERTICALLY, RUNNING COMPLETELY AROUND THE OUTSIDE OF THE DECK. <br />THESE WILL BE SEPERATED BY 6 INCH CENTERS. <br />AGAIN, I HOPE THAT THIS IS ALL THE INFORMATION WHICH YOU WILL NEED FOR THE RAPI. <br />APPROVAL OF A BUILDING (?) VARIANCE AND CONSTRUCTION PERMIT. IF YOU HAVE ANY <br />OTHER QUESTIONS, PLEASE DON’T HESITATE TO GIVE ME A CALL—HOME-471-8690; <br />WORK-553-7759. <br />UON W. PAPAS <br />3369 CRYSTAL BAY ROAD <br />ORONO, MN <br />• V ■r <br />'■V <br />Pd <br />■ I <br />* . :vmmm im <br />1 <br />r
The URL can be used to link to this page
Your browser does not support the video tag.