Laserfiche WebLink
• :'^!v.--.,\ ■*■ -^ /-V': -•;&H.P^ <br />OF MY CONSTRUCTION <br />TER FROM MY NEAREST <br />MY PROPERTY. <br />^E VIEW OF LAKE <br />iH ALL OF THESE <br />FRONT OF MY PREMISES <br />[ANCE APPLICATION, <br />]MMON SENSE. I <br />'RUCTURES ON MY <br />AS TO SETBACK <br />SHOW YOU THAT OTHER <br />.ACE; RATHER, MY <br />IS MORE OF A MATTER <br />COMPARE IT TO THE <br />:VELOPEMENT AND USE <br />L <br />AIN MY CONSTRUCTION <br />RUCTION PLANS, I AM <br />TIONS WHICH YOU MAY <br />ON PLANS. <br />JJECT. WHEN THIS <br />{lAL WILL BE <br />) TO AS TREATED). <br />INSTRUCTED OUT OF <br />.LING IS BUILT ON <br />[RS (CUT TO LENGTH), <br />^DER. THE FRONT <br />TIED TO A SERIES <br />rREATED, 2X8 JOISTS <br />IE CONECTED TO THE <br />DERATED BY 16 INCH <br />3NECTED ATTACHED TO <br />REDWOOD LUMBER. <br />TED NEXT TO THE <br />ST SITUATED FIVE <br />THE DECK LOCATED <br />ED TO THE OUTSIDE <br />CH FORM THE OUTSIDE <br />V I <br />BUILDING PERMIT PAGE #2 <br />THE FRONT, SECTION OF THIS DECK IS CONSTRUCTED AS FOLLOWS: THERE ARE FIVE <br />4X4 REDWOOD SUPPORT POSTS. TWO WERE PREVIOUSLY MENTIONED AS THE CORNER POSTS <br />OF THE 10 FOOT SIDES. ONE FOOT FROM THE WESTERN SIDE CORNER POST IS ANOTHER <br />4X4 REDWOOD POST. THIS WILL SUPPORT THE RIGHT HAND RAIL AND STEP/ENTRANCE <br />TO THE DECK. THREE FEET EAST OF THAT YOU WILL FIND ANOTHER 4X4 REDWOOD POST <br />WHICH WILL SUPPORT THE LEFT HAND RAIL AND STEP. FIVE FEET FROM THAT POST YOU <br />WILL FIND ANOTHER 4X4 SUPPORT POST. THE LAST 4X4 SUPPORT POST FORMS THE EASTER <br />END OF THE FRONT OF THE DECK. ATTACHED TO THESE SUPPORT POSTS WILL BE ANOTHER <br />2X6 REDWOOD BEAM WHICH WILL FORM THE FRONT OF THE DECK. <br />THE POST AND HEADERS WILL BE CONECTED WITH 5/8 INCH, FOUR INCH LAG SCREWS <br />WHEREVER THEY MEET. THIS DECK WILL BE 15 INCHES ABOVE GRADE, THEREFORE, THERE <br />WILL BE ONE STEP BUILT AT THE FRONT ENTRACE OF THE DECK. <br />THE DECKING ITSELF WILL BE 2X6 RE WOOD DECKING. THE DECKING WILL RUN THE 19-^ <br />THE DECK. THESE WILL BE TIED TO THE JOISTS BV 16 PENNY SfiLVfiNlSED NOILS <br />THERE WILL BE A TOP RAIL SITUATED 36 INCHES ABOVE THE DECKING RUNNING ACROSS <br />THE PERIMETER OF THE DECK. THIS WILL FUTHER ADORNED BY A SERIES OF 2X2 REDWOOD <br />PICKETS, HUNG VERTICALLY, RUNNING COMPLETELY AROUND THE OUTSIDE OF THE DECK. <br />THESE WILL BE SEPERATED BY 6 INCH CENTERS. <br />AGAIN I HOPE THAT THIS IS ALL THE INFORMATION WHICH YOU WILL NEED FOR THE RAPI <br />APPROVAL OF A BUILDING (?) VARIANCE AND CONSTRUCTION PERMIT. IF YOU HAVE ANY <br />OTHER QUESTIONS, PLEASE DON’T HESITATE TO GIVE ME A CALL—HOME-471-8690; <br />WORK-553-7759. <br />wm <br />iV <br />OON W. PAPAS <br />3369 CRYSTAL BAY ROAD <br />ORONO, MN <br />r" <br />i <br />V.