Laserfiche WebLink
Iministrator <br />I Boulevard - <br />Lesion Notice of <br />by the Planning <br />inning Commision <br />e an authorized <br />1 be responsible <br />itract for 394 <br />by the Planning <br />in that notice, <br />srs. <br />in regarding the <br />sarth should be <br />led. Review his <br />Lodic seeding of <br />i side slopes be <br />of the month of <br />iber when deemed <br />e would suggest <br />disturbed state <br />:aining the side <br />Sion of the site <br />the following <br />in the original <br />tSr Exhibit J: <br />ding and grading <br />ty is receiving <br />ide and seed the <br />if the months of <br />nd November if <br />stions posed by <br />ontractor, the <br />inditions found <br />3nal use permit <br />“323 *73-7357 _ _ _ _ _ _ _ _ Dat. of Hotic 8/23/88 <br />COPIBS TOj Park Construction <br />3245 Wayzata Boulevard Attn: John Gannon <br />Long Lakep MN 55356 7900 Beach Street NE <br />__ _ _ _ Minneapolis, MN 55432 <br />APPLICATIOH8 Renewal Conditional Use Permit <br />WTB OT MBBTHI6: 8/15/88 VOTE* 5 For 1 Against <br />*“'**“*” Tobled for reasons noted below. mOTBS AED SPECIAL COEDITIOESi <br />CoBBlMlon the questions raised by the Planningcommission in their preliminary review of your application, staff has <br />contact«l the City Engineer and has requested that h^provide S report wl?S <br />guidelines to staff concerning the issue of the <br />Mr Co^k earth should be allowed to remain on the site.Mr. Cook has just briefly suggested that once filling has begun, specific <br />eo^ 1 ^ established whereby if earth remains in an undisturbed <br />^ ®i o”« inspection period to another, that at the second <br />period, the earth be required to be graded and seeded at the <br />As for the Planning Commission's concerns, it would be helpful if Mr <br />as*^ollow8*^ certain concerns raised by the Planning Commission, <br />I'nn ?? example of the duration of time it would take to fill <br />f steady supply of fill was available, and then <br />of time^ another example where filling could go over a 6 month period <br />2. Confinn the carrying capacity of a tandum truck and establish the <br />cubi ^^eJrds^of^fill* ^*ndum vehicles would require for the 100,000 <br />the traffic safety procedures when entering sights, <br />Ell’lnaiJ.*. area like the Highway 12 area where Mr.Eislnger*s property is located: <br />A) Can a temporary passing lane be provided? <br />trafSc?^*"*’^^*^^ filling signage be provided to alert on-coming <br />C) Does the State Highway Department allow such signage and <br />temporary turning lanes if needed? ^ <br />D) Point of information: Who repairs road sections when private <br />construction vehicles damage the roadbed? Does the State Highway <br />Department provide such protection to the local community? <br />. .. .;*■