My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
09-19-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 9:16:25 AM
Creation date
12/14/2023 1:59:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4____ <br />Utitnow. f.E. Chart** ^ Ertduoo <br />Lynch, P.f. «ao M. fam«i*y <br />toiand, r.f. Hirtan M. O«on <br />Andcnon, r,t $*»**" M. B««n <br />Ktwiann. P.f. Martt A, Selp <br />af*. PE. <br />Rutiafe. AJA. <br />Angus. P.E. <br />^ Santofrt. PE. <br />■i! <br />JUL I fl <br />itates . The proposed <br />»ad 19. <br />5ve loped to provide <br />» city in preparing a <br />ty <br />•}: <br />■I <br />?.x:1 <br />■w <br />iW''’ <br />Wi-:'-. <br />*-5 <br />■ .>4 <br />I <br /><r <br />■Y <br />I <br />a«» <br />£XA e^r-ifc <br />hL.4NEPIN <br />DEPARTMENT OF TRANSPORTATION <br />320 Washington Av. South <br />Hopkins, Minnesota 55343-8468 <br />935-3381 ll <br />July 27, 1988 <br />Ms. Jeanne A. Mabusth <br />Building and Zoning Adnlnlstrator <br />City of Orono <br />P. 0. Box 66 <br />Crystal Bay, MN 55323 <br />0 <br />Dear Ms. Mabusth: <br />PE: Proposed Plat - White Ponds Estates <br />CSAH 19/84, Southeast quadrant <br />Section 6, Township 117, Range 23 <br />Hennepin County Plat No. 1657 <br />Review and Recomiendatlons <br />Minnesota Statutes 505.02 and 505.03, Plats and Surveys, require County review of <br />proposed plats abutting County roads. We reviewed the above plat and Make the <br />following coaaents: <br />- For future laproveaents to this segment of CSAH 19 the developer should dedicate <br />an additional 17 feet of right of way where necessary along CSAH 19 to make the <br />right of way a minimum of 50 feet from the center of CSAH 19. <br />- For future Improvements to CSAH 84 the developer should dedicate an additional 7 <br />feet of right of way making the right of way 40 feet from the center of CSAH 84. <br />• Any new access to a county road or revision to an existing access r>:qu1res an <br />approved Hennepin County entrance permit before beginning any construction. <br />Contact our Maintenance Division for entrance permit forms. <br />-> All proposed construction within County right of way requires an approved <br />utility permit prior to beginning construction. This Includes, but Is not <br />limited to, drainage and utility construction, trail development, and <br />landscaping. Contact our Maintenance Division for utility permit forms. <br />- The developer must restore all areas disturbed during construction within County <br />right of way. <br />Please direct any respaiise or questions to Les Weigelt. <br />Sincerely, <br />David W. Schmidt, P.E. <br />Transportation Planning <br />DWS/LDW:lw HENNEPIN COUNTY <br />an equal opportunity employer <br />Si 1 <br />i rt <br />■it ■h i■A- <br />=• <br />i ■'i': <br />4 •
The URL can be used to link to this page
Your browser does not support the video tag.