My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
08-15-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 8:58:19 AM
Creation date
12/13/2023 3:44:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■jr.- -i* ,V <br />as follow*I <br />by applicant or aa <br />to draft appropriat# <br />26th abating. <br />nit aai <br />I Information to th* <br />nit by tha Councilt <br />irate alavation* of <br />^a not to axcaad 5tl <br />following guidalina*i <br />It in from tha top of <br />of tha marah (972*) |m||| <br />I (982*) plu* 5 tmrntmm <br />iturbed areas must ba <br />"■'M <br />ixecute a Developer** <br />er final grading and <br />I4 <br />■ "5- <br />• *1, <V ' <br />fbf flayof Crabafe <br />Ofeno Council Namibarii <br />City hdmiaiotrator Bamhardsoa <br />t <br />DATii <br />iOBJl <br />jaamia A. mabuatb. timing Admimistrator <br />Jana 1« 1987 <br />•118) toward lisiiigar* )249 Haysata Had <br />Cttiditiomal Qa# Mrmit •• tasolutiM <br />Uat of fcdiibitat - <br />A - Bfaon Imgiaaaring tatter <br />t - Council totlca of Actloa <br />■BbBitt«d tbB aalatlB* t*«t d»t« of 1»74 to tbo otiflioAi <br />•aqlnoorln9 fii» that eoadoetod tha taata. ■aalaa tahibit A. <br />Braaa Baqlaaarlaq atatai as follovat <br />•it is oar oplaloa that tha propoaad addltloa ol <br />of alnaral aoll aboaa tha top of tha aaiatlnq landflil <br />gtadaa praaonta a aary alight ria» of ahaar falluxa. <br />ftia following raaaon* are citedi <br />1. fast exparlanca with similar landfill .ite* tituatad <br />2^^*'E*'l*tinV*landf i 11 material probably po**a»*a* hi^ <br />internal ai^la of friction and a higri *haar *trangth ba*ad <br />T sJJttliSlnt^t^^V occurred over tha pa*t )0 year* will <br />TiIncase the *haar atrangth of the upper tone Of <br />oi^^i^ .o?lV.nd\i*l^ laa.an rl.A of .h.ar a* a result of <br />placing m additional *urcharge load. <br />staff ha. -ot olth both El.ln,ar aadproparatoty atapa raqult.d »c that tha patait at th. loo.uou <br />cubic yard level may be approved by council. <br />A. Braun to9in..rln9 fTf“t«! <br />determine if there i* en abnormal rate of settlement. <br />6t.ff ha. *A>Vur'.ThaV fi^r'g^Tfn^ <br />and*7Mdlng wiil ba coapleted .van if the fill project as <br />proposed is not realised . <br />Th. Bngineer-a r.coa-endation. <br />inspection schedule and monitoring fil P j <br />referenced in this resolution. <br />toning Fi) <br />dune it l^ <br />fage 2 <br />Gannon hSi <br />8aulings <br />imaginad. <br />project • <br />feel a <br />aacesaar' <br />iuch tmq\ <br />fha attac <br />at 100p0( <br />•hall be <br />ei this I <br />of the 1 <br />contractf
The URL can be used to link to this page
Your browser does not support the video tag.