My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1994 Council Packet
Orono
>
City Council
>
1994
>
11-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 12:21:27 PM
Creation date
12/11/2023 12:17:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i I <br />; <br />• i ^ <br />r - <br />■ ♦, i ♦. •< ^ •> <br />« >•- tv . <br />f %.\ .,’r-*-•■ , j <br />' ■ ». « ; \*y. ,• , <br />. •*■ ?’.f .-i ' <br />Hennepin County <br />JL An Equal Opportunity Employer / <br />SEP Z\ <br />September 16, 1994 <br />CMichael P. Gaffron <br />Asst. Planning & Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay. MN 55323-0066 <br />RE: Proposed Site Plan - Post Office ^ _eSAH 146, west side approximately 240 feet north of North Shore Or <br />Section 10, Township 117, Range 23 <br />Hennepin County Plat No. 2181 <br />Review and Recommendations <br />Dear Mr. Gaffron: <br />We reviewed the above site plan and make the following comments: <br />• The location of the proposed access, approximately 34 feet north of the <br />south line of lot 3, is acceptable. The developer must have an approved <br />Hennepin County entrance permit before beginning access construction. <br />The developer should contact Dave Zetterstrom at 930-2548 for permit <br />forms. <br />• As a safety benefit after the parking lot is constructed, the City should <br />prohibit parking on the road shoulders in front of the Post Office. At <br />the City’s request, by Council resolution, Hennepin County will provide <br />and install no parking signs alo»'g the shoulders of CSAH 146. <br />• All proposed construction within County right of way requires an approved <br />utility permit prior to beginning construction. This includes, but is <br />not limited to drainage and utility construction, trail development and <br />landscaping. Contact our Permits Section at 930-2550 for utility permit <br />forms. <br />• The developer must restore all areas, within County right of way, <br />disturbed during construction. <br />Please direct any response to Doug Mattson. <br />Sincerely, <br />---------------------------------------- <br />Thomas D. Jqhnson, P.E. <br />Tran$port»t^pP}«n|,n^^|}e^^^^^ ______________ <br />TDJ/DBM ” <br />16^ <br />320 Washington Avenue South <br />Hopkins. Minnesota 55343-8468 <br />(612) 930-2670 FAX:(612) 930-2513 TDD:(612) 930-2696 <br />RicyckJ Paper
The URL can be used to link to this page
Your browser does not support the video tag.