My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1994 Council Packet
Orono
>
City Council
>
1994
>
11-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 12:21:27 PM
Creation date
12/11/2023 12:17:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.2.6. The City of Long Lake agrees to provide to MCWD, for one dollar and other <br />valuable consideration, the land rights necessary to hold the on-shore support system <br />necessary to maintain the proposed aeration system. <br />3.3. Hennepin County <br />Hennepin County agrees to provide the necessary interim financing to MCWD for the <br />activities identified in this Agreement as MCWD responsibilities. Hennepin County’s <br />financial responsibility to this Agreement will be limited to that provided for in Minnesota <br />Statutes Section 103B.251. <br />4. Monitoring Plan <br />MCWD agrees to develop and implement a water quality monitoring plan <br />("Monitoring Plan") which will identify the specific sampling procedures, analytic methods, <br />detection limits, quality assurance and quality control procedures in order to facilitate the <br />accurate measurement of baseline data and any changes in water quality throughout the Long <br />Lake subwatershed for the duration of this project The Monitoring Plan shall be submitted <br />to the Project Advisory Committee described in paragraph 5.1 of this Agreement, on or before <br />May 1, 1995 for review and comment by all parties to this Agreement before any actions <br />implementing the Monitoring Plan are commenced. On or before June 1, following review <br />and comment by the Project Advisory Committee, the Monitoring Plan shall be agreed upon <br />and adopted by all parties as an amendment to this Agreement The MCWD shall be <br />responsible for the selection of a qualified laboratory to perform the data analysis required by <br />the Monitoring Plan and shall be responsible for the costs of the laboratory sample analysis. <br />275/14070323 10/31/94 <br />1.1
The URL can be used to link to this page
Your browser does not support the video tag.