My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1994 Council Packet
Orono
>
City Council
>
1994
>
11-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 12:21:27 PM
Creation date
12/11/2023 12:17:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
! <br />3. General ResponsIhlUties of Parties <br />3.1. MCWD <br />The MCWD shall be responsible for the design, construction, and technical <br />maintenance and operation of the stormwater treatment systems for the purpose of reducing <br />internal and external phosphorous loading into Long Lake. These systems shall consist of <br />sedimentation basins, detention/retention of runoff, stormwater diversions, restoration of wet <br />detention pond/wetland areas, construction of wet detention ponds/wetland treatment systems <br />specifically designed to remove nutrients from stormwater runoff, and construction of aeration <br />systems to maintain areas of well oxygenated water (hereinafter referred to collectively as <br />"improvements"). <br />3.1.1. The parties anticipate the construction of two hypolimnetic aerators, one for <br />each basin of Long Lake, to reduce in-lake phosphorous loading. The parlies al:;o anticipate <br />the construction of three wet detention ponds/wetlands to treat external phosphorous loading; <br />one between County Road No. 6 and the DNR protected wetland adjacent to the north side of <br />Long Lake, and two connected basins adjacent to Long Lake in a city designated park. These <br />systems will be selected and designed by MCWD. based upon a determination of their <br />feasibility as provided below in sub-paragraphs 3,1.3 through 3.1.5 of this paragraph of the <br />Agreement <br />3.1.2. The MCWD will pay for the installation of structural fish barriers at the outlet <br />of Long Lake, at the outlet of the Long Lake City Park wet detention pond/wetland, and at <br />the outlet of the County Road No. 6 wet detention pond/welland, subject to assumption of the <br />275/14070525 10/31/94 <br />I <br />J
The URL can be used to link to this page
Your browser does not support the video tag.