My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1994 Council Packet
Orono
>
City Council
>
1994
>
11-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 12:21:27 PM
Creation date
12/11/2023 12:17:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r 0 <br />5. <br />7. <br />8 <br />9 <br />10. <br />Inspect the inlerk>r surfaces and equipmciu inside the filtniiKM) aiul softenii^ uaiis. <br />Sample and inspect the filler media, support j^ravels and /eoliie <br />granular medias. <br />FaciUlaie water quality samplii^ and testing of the raw water, filtered <br />water, softened water and fmislied water streams. Tliis will ilicn Ik* <br />used to assemble a "procets*wise” water cuality scIkmiuhc. <br />Determine the hydmilic capacity of the filtration unit, zeolite solteiiers <br />and plant piping. <br />Faciliiaie a pointed survey of the Navane water cu.stomers to <br />determine the number of point-of-eniry water softeners that arc in use. <br />The nesults may give some indication of tlie need for iIk* exi.Ming <br />zeolite softeners at the water plant. <br />Tabulate and review the quantity of chemicals used annually. <br />Propose and evaluate possible means of reducing tlie amount of <br />dissolved oxygen being intiwhiced in the aeraikm/filier inki portion <br />of the filtration unit. The cost of these options is to be compared to <br />the costs of feeding chemical corrosion inhibitors for reductioii of <br />copper. <br />Prepare a draft report of the project findings and recommendations fur <br />review with the City staff. liK’luded will lie cost estimates of all <br />improvement items. <br />Prepare final report. <br />Pciivttibte;Fifteen (LS) copies of the Water Treatnient Facility Evaluation Report <br />Con^nsaii We propose to perform this work for a lump sum amount of S16.4S0. <br />It is our feeling that mid to late Fall would be the best time to proceed with this project <br />because any improvement work could then be completed by early Spring. We cx|iect tliat <br />troprovemeni costs for the water plant will vary depending on tlieir nature and ex;eiil. If <br />the iropfovemenis are only replacement of filler media and repainting of tlie building <br />interior, the costs are likely not to exceed $60,000. If, however, this work is r <br />with replacement of some electrical controls and installation of an effective d^uniiditlj <br />system to control condensation and corrosion, the improvement
The URL can be used to link to this page
Your browser does not support the video tag.