My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1994 Council Packet
Orono
>
City Council
>
1994
>
11-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 12:21:27 PM
Creation date
12/11/2023 12:17:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. <br />5. <br />b. <br />c. <br />d. <br />Per Section 10.02, Definition 36 that defines a front lot line for a comer <br />lot, the front lot line for Lot 1 must be defined at County Road 84 where <br />the existing platted corridor measures only 179 ’. <br />Lot 1 would not require a lot width variance if the front/street yard was <br />defined along McCulley Road where there is some 745 lineal feet. <br />Access for Lot 1 will be provided along McCulley Road and yet the code <br />would require that the front/street yard be defined at Bayside Road. <br />3. Both lots have adequate and suitable soils for on-site treatment facilities. <br />Each lot has been approved for access either at Bayside/County Road 84 or <br />McCulley Road. <br />Each lot can be developed without the need for granting setback variances for <br />residential construction. <br />NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of the <br />findings noted above, the City Council of the City of Orono hereby approves the preliminary <br />plat application of Don P. Gamble, III and Quatro Oil Ventures, Inc. per plat drawings by <br />Raymond A. Prasch, a licensed survey of Lot Surveys Company, Inc. dated 9-22-94, subject to <br />the following conditions: <br />1. Dedication of an additional 7 ’ of right-of-way for future improvements at the <br />intersection of County Road 84 and McCulley Road. The 7 ’ of additional right- <br />of-way shall extend for 40’ starting at the intersection of McCulley Road and <br />County Road 84 and run easterly along County Road 84. <br />2.Dedication of drainage and utility easements 10’ along the perimeter boundary of <br />the properties and 5 ’ along the shared lot lines. <br />3. All residential construction shall meet required setbacks of RR-1A zoning district <br />as follows: <br />100’ front and rear setback <br />50 ’ side setback. <br />Page 2 of 5
The URL can be used to link to this page
Your browser does not support the video tag.