Laserfiche WebLink
r August 31. <br />Ab o.lU«e of the proccdarat aad niateriab lo be ased for altcriat aad <br />mioring approiimalHy 7.5 acres of wrllaad oa the Brace Dayloa property <br />im Oroao <br />The followinc outline defines vwwk which will be done to crane open waet in tto «*>«>»• <br />Neiriy all of the «t»i will be done from w.thin the excavatum <br />dtsTuplmn to the surroundtng naluial area Detailed constmenon <br />.« yet to be developed, but wHll be provided to accompany wonting specilkalions. <br />The project vhill include the following: <br />A. Site f rep«»**^= <br />1. During October or November of 1994. a controlled burn using appropriate <br />procedures, eqiripment and permits will be implemented. <br />Erosion silt fencing will be placed around all areas designated for excavatum. <br />deposition or construction traffic. <br />2. <br />Coastrvetiott: <br />1.During the winter of 1994-95. excavation aiul transport of Uie ' <br />x;;;; specinc «,uipnKm mid proeesse, to be used remain, undefiiwd «this <br />time. <br />During May or June of 1995. the primary dike will be built. Driveway <br />recon^lLi may also occur during this lime. Again, working drawings and <br />specifications remain undefined. <br />Al <br />C. <br />1. <br />Rcstoralioii: <br />Seeding will be done during the spring ofl 995. All disturbed areas above water <br />will be^seeded with seed collected from the adjoining natural areas al a rale of one <br />pound per 1000 square feet. <br />Individual seedling plants will be added lo the seeded ansM al a rale of 1 per 10 <br />square feet. The species used will be chosen from Ihe lollowing hsl of <br />possibilities.