Laserfiche WebLink
r <br />Zoning File #1962 <br />Sq)iember 15, 1994 <br />Pigc 6 <br />• City Enginccf Shawn Gusufson has reviewed the project and requested; <br />- Engineered plans or details for the dike sinicmre. <br />. Specific upland areas proposed for the mateiial disposal. <br />. Erosion control methods proposed for disposal areas. <br />Thi, Utfonn-ion to b«n «ce«ly pn>vi^. bov.vc Mr. Gusufson is on vseion to <br />not had a chance to review the further information <br />iSummary of Issue for Dbew <br />• Method of excavation proposed <br />Has a contractor been chosen? <br />Wsier quality considenuions related to assimilattve capacity »f th« <br />Potential filling of wetland at south disposal site. <br />Poteniul drainneld dismption and future drainfield elimination at south disposal site. <br />Off site spoils disposal method. <br />■Best Management Practices for Protecting Water Quality in Urban Areas’ must be <br />adhered to <br />site protection, revegeution scliedule, etc. <br />aty En,.i,«er to review additional dau provided on 9/14/93 regarding outlet <br />Structure.31IUVI.UIW. <br />Anv approval ts subject to requirements of the Minnehaha Creetc Watershed District. <br />wTwould appreciate their comments on the project. <br />c‘i ■ <br />v't <br />1