My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-1994 Council Packet
Orono
>
City Council
>
1994
>
09-26-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 11:15:47 AM
Creation date
12/11/2023 11:12:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BBKBStSg <br />\ <br />Ml ( <br />^CJiVCllMEETINe <br />REQUEST FOR COUNCIL ACTION ~ ^ ^*’^4 <br />DATE: S«5!wnbP/29WM <br />ITEM NO: ' i <br />Department Approral: <br />Naiac Ron Mooise <br />Hlk City Administrator <br />Administrator Reviewed:Agenda Section: <br />City Admifarfstrators <br />Report <br />Item Description: <br />Additional Monitoring of the Former City Hall Underground Fuel Tank Sites <br />As part of the relocation of the city facilities, three fuel tanks were removed from the old city <br />facilities site. As part of the tank removal process some contamination of soils from ftiel <br />leakage was detected. In order to determine the extent of the contamination seven soil borings <br />and four monitoring wells were installed on the site. Groundwater samples were collected from <br />the monitoring wells in May and July of 1994. The findings from three of the monitoring wells <br />indicate no problems with contamination. However, the findings from one of the wells indicate <br />a higher level of contaminants than anticipated. <br />Braun has recommended that two additional soil boring and one additional monitoring well be <br />installed to fully define the extent of the contamination. Groundwater will be sampled and <br />analyzed on a quarterly basis for one year. The estimated cost for this work is $12,302. Greg <br />Browne, of Braun Intertec, will be present at the Council meeting to explain the findings of the <br />Lnitial round of groundwater sampling, and the need for the recommended additional monitoring. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve the additional two soil borings, monitoring well, and soil and groundwater <br />sampling and analysis by Braun Intertec at an estimated cost of $12,302. <br />JLlAl a; 1 m
The URL can be used to link to this page
Your browser does not support the video tag.