Laserfiche WebLink
!•) Check the instructions for your <br />particular base to dig proper sire <br />hole. Place each ten^foot toner <br />section end to end in correct order <br />of asseabiyi sUrt by putting the <br />bottoa section at which place the <br />tower will stand. Mike ure enough <br />clearance exists so that the tower <br />can later be walked up to its <br />upright position without overhead <br />interference. <br />2.) Bolt the bottoa 10 feet of tower <br />to the base and place it in the hole. <br />Be sure tilt direction is coaaon for <br />all base legs and positioned proper­ <br />ly as concrete is poured. <br />3.) Getting bottoa section pluab is /) J <br />very iaportant. Vfhile concrete is —X—r—^ <br />setting up, base can be levelled by <br />using a carpenters level on the up­ <br />right of the section used to keep <br />the base spread <br /><.) Allow 3 to 4 days for concrete to <br />set up. <br />5.) Remove one bolt froa each front <br />leg and three bolts from rear leg <br />as shown. Tilt bottoa 10 ft. sec­ <br />tion to ground and connect remain­ <br />ing tower sections into the final <br />assembly. Attach all wiring and <br />fit antenna to tower. <br />6.) Walk up tower to its upright posi­ <br />tion, replacing bolts in the base to <br />secure the tower. <br />tm 0 <br />% <br />0 S • <br />w <br />0 <br />:V ^N40• L <br />L