Laserfiche WebLink
I.) Check the instructions for your <br />particular base to dig proper size <br />hois* Place each ten-foot tower <br />section end to end in correct order <br />of asseoblyi start by putting the <br />bottoa section at which place the <br />tower will stand. Mike sure enough <br />clearance exists so that the tower <br />can later be walked up to its <br />upright positio.i without overhead <br />interference. <br />2.) Bolt the U>tton 10 feet of tower <br />to the base and place it in the hoie. <br />Be sure tilt direction is coounon for <br />all base legs and positioned proper­ <br />ly as concrete is poured. <br />3.) Getting bottow section plunb is <br />very iaportant. While concrete is <br />setting up, base can be levelled by <br />using a carpenters level on the up­ <br />right of the section used to keep <br />the base spread. <br />4.) Allow 3 to 4 days for concrete to <br />set up. <br />5.) Remove one bolt from each front; <br />leg and three bolts from rear leg <br />as shown. Tilt bottom 10 ft. sec­ <br />tion to ground and connect reaain- <br />ing to««r sections into the final <br />assembly. Attach all wiring and <br />fit antenna to tower. <br />6.) Walk up tower to its upright posi­ <br />tion, replacing boits in the base to <br />secure the tower. <br />i f. <br />i <br />i <br />^ 4 <br />---------