Laserfiche WebLink
ctlinembenZooiag Adminiscrator(enhance at Plaiming Commissioa Meetiiigs for <br />ice for CouncUmembers to attend tbe Planning <br />Tuesday) <br />letten <br />(Tuesday) <br />XT <br />KMir <br />lahan, Jr. <br />)etien <br />xnir <br />4 <br />ley <br />lahan <br />4 <br />wtten <br />ting <br />ly of the month commencing May through <br />Ps discretion depending upon the number <br />MINtTCS OF THE CITir OF ORONO PLANNING COMMISSIONMEETING HELD ON MAY Id, I9MATTENDANCEThe Orono Planning Commissioo met on May 16, 1994 in the Oiono City Council <br />Cb*mbeis with the foHowing memben pcesent: Chair Charles Schroeder, Comm^ssioacrs <br />Charles i<3lan. Steve Peterson, Janice ^rg, Candace Rowlette, and Dale Lindquist. <br />Cdmmittionrr Sandra Sauth was absent. The following represented suff: Building and <br />Zoning Administrator Jeanne Mabusth, Assistant Planning and Zoning Administrator <br />Michael Gaffron. and City Recorder Barbara Anderson. Chair Schroeder called the <br />mrrfing to order at 7:00 p.m. <br />(#1) #1«S3 TANDEM PROPERTIES, WATERTOWN ROAD • <br />PREUMINARY StWUVISION • PiWLIC HEARING TO BE RESCHEDCLED <br />BEFORE THE PLANNING COMMISSION MEETING OF JUNE 20,1994 AT <br />APPUCANTS REQUEST. <br />(#2) #1999 PAT WOLFE, 2B71 CASCO POINT ROAD • APTER-THE FACT <br />VARIANCES • PUBLIC HEARING • APPLICATION WTIHDRAWN BYCmr <br />(#3) #1904 ERIC AND SHELLY UUEQUIST, 34M BIRCH LANE • CONDmONAL <br />USE PERMIT/VARIANCE • PUBLIC HEARING <br />Chair Schroeder noted that the Certificate of Mailing and Affidavit of Publication were <br />on file with the City. Mabusth reviewed the staff report and stated that staff <br />recommended approval of the requests subject to the conditioos listed in the staff report. <br />Nolan commented that he feh that the grading was going to be close and was «iasure that <br />the swale would soKe the drainage problems. Mabusth stated that this was what the City <br />Engineer had recommended and that staff will require a final grading plan with building <br />permit application for the engineer’s review. <br />Erk Liljequist stated that he had understood that the purpose of tbe depression was to <br />hold the water before it ran off into the lake and now they were creating a swale to <br />facilitate drainage into the lake which was confusing. Mabusth reviewed the elevations <br />and the engineer’s recommendation for mitigating the filling of the flood plain as <br />required by federal flood control regulations. Nolan commented that the reason for the <br />swale was to provide relief if the lake level rose above normal and provide somewhere <br />for the water to go. <br />It was moved by Schroeder, seconded by Nolan, to recommend approval of #1V0^ <br />Conditional Use PermitA^ariance for Eric and Shelly Liljequist at 3940 Birch Lane <br />subject to the conditioos noted in tbe engineer’s report and requiring the applicant and <br />the engineer to resolve questions regarding the elevations prior to City Cbuncil leview. <br />Ayes 6, nays 0.