My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-1994 Council Packet
Orono
>
City Council
>
1994
>
06-13-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 4:22:31 PM
Creation date
12/8/2023 4:19:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i■••• •.. V-... r;•. . ' . M /-I- ^*• <br />NOTES & SPECIFICATIONS <br />• TIMBERS ARE TO BE FASTED WITH TYPICAL POLE BARN NAILS. <br />THEN SECURED WITH 12" SPIKES. <br />• ALL TIMBERS ARE TO BE 5* x 6" CEDAR TONE PRESSURE <br />TREATED QUALITY. <br />• ALL SOIL AROUND STRUCTURE IS TO BE COMPACTED TO 95%. <br />• TIMBERS ARE TO BE OF HIGH QUALITY. NO SPLITTING. <br />WARPING. OR CURVATURE OF ANY DEGREE. <br />• SOIL IN AND AROUND EACH STEP TO BE AT 95% COMPACTION. <br />• EXISTING RETAINING WALL TO BE REMOVED BY CONTRACTOR. <br />• CONTRACTOR RESPONSIBILITY FOR PROPER AND LEGAL <br />DISPOSAL OF EXISTING RETAINING WALL MATERIALS. <br />• CONTRACTOR RESPONSIBILITY FOR UTILITY LOCATIONS <br />• FOR TIMBER WALL LOCATION SEE LOT SURVEY PLAN <br />4-0' <br />o <br />r □j t IA <br />-3 <br />4-0* <br />‘-----------------------------------J <br />4 <br />4-0‘ <br />1 <br />»o <br />TYPICAL STEP DETAIL <br />SCALE: 1/4* - V O’
The URL can be used to link to this page
Your browser does not support the video tag.