|
PERMITS ISSUED/FEES OOLLBCTED APRIL 1994REPORT NBR. BPRMTISS-1 DATE OF RUN 05/12/94PERMIT TYPEBuilding SQL FAMILY-NEW SF-ADD/REMODEL
<br />SF-ACC STRUCTURE
<br />DEMO/PRINCIPAL
<br />COM-ADD/REMODEL
<br />INST-ADD/REMODEL
<br />INST-LAND ALT
<br />QTY718
<br />2
<br />1
<br />2
<br />1
<br />0
<br />***** PERMIT ISSUED REPORT CITY OF ORONO-- CURRENT RANGE - 04/01/94 - 04/30/.tBASE FEE8,2302,-20
<br />3iS7
<br />80
<br />270
<br />83
<br />0
<br />0050
<br />00
<br />00
<br />00
<br />00
<br />00
<br />VALUATION1,775,400.00 190,000.00
<br />3b,000.00
<br />0.00
<br />23,800.00
<br />3,500.00
<br />0.00
<br />PLAN REVIEW5,3491,035
<br />230
<br />0
<br />0
<br />40
<br />0
<br />5378
<br />55
<br />00
<br />00
<br />95
<br />00
<br />QTY124
<br />4
<br />2
<br />0
<br />0
<br />1
<br />PAGE: 1REQUESTER: CAROLE-- PREVIOUS RANGE - 04/01/93 - 04/30/93BASE FEE7795,108
<br />235
<br />100
<br />0
<br />0
<br />0
<br />5000
<br />00
<br />00
<br />00
<br />00
<br />00
<br />VALUATION140,000.00 689,390.00
<br />17,900.00
<br />0.00
<br />0.00
<br />0.00
<br />0DEMO-ACCESSORY 0 0.00 0.00 0.00 2 60.00 0.00ACC/GARAGES 2 180.00 12,800.00 81.90 0 0.00 0.00Sub-total 33^11,310.50*2,041,500.00*6,746.71*34*6,202.50*047,290.00*
<br />Mechanical
<br />HEATING SYSTEMS 6 552.42 41,366.00 0.00 2 312.50 25,000.00
<br />AIR CONDITIONING 2 70.00 4,495.00 0.00 5 200.75 20,955.00
<br />WOOD STOVE/FLUE 1 35.00 2,600.00 0.00 0 0.00 0.00
<br />FIREPLACE 4 332.50 23,500.00 0.00 5 169.95 8,000.00FUEL STORAGE 1 35.00 2,000.00 0.00 0 0.00 0.00GAS LINE INSPECT 0 0.00 0.00 0.00 1 30.00 300.00Sub-total 14*1,024.92*73,961.00*0.00*13*801.20*54,255.00*
<br />Plumbing
<br />FIXTURES 11 1,267.14 91,670.00 0.00 9 653.01 45,491.00
<br />WATER METER 0 0.00 0.00 0.00 1 235.00 0.00REPLACE METER 0 0.00 0.00 0.00 1 0.00 0.00Sub-total 11*1,267.14*91,670.00*0.00*11*008.01*45,491.00*
<br />Sewer U Water
<br />SEWER CONNECTION 0 0.00 0.00 0.00 7 245.00 0.00
<br />SAC ONLY 0 0.00 0.00 0.00 9 6,750.00 • 0.00
<br />SEWER & WATER 0 0.00 0.00 0.00 1 70.00 0.00
<br />Sub-total 0*0.00*0.00*0.00*17*7,065.00*0.00*
<br />Sign
<br />PERMANENT/POSTED 1 35.00 0.00 0.00 0 0.00 0.00
<br />Sub-total 1*35.00*0.00*0.00*0*0.00*0.00*
<br />User Defined
<br />LAND ALTERATION 1 50.00 0.00 0.00 1 50.00 0.00
<br />Sub-total 1*50.00*0.00*0.00*1*50.00*0.00*
<br />Grand-total 60**13,687.56**2,207,131.00**6,746.71**76**15,006.71**947,036.00**
<br />PLAN REVIEW506.682,017.94
<br />143.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />2,667.62*
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00*
<br />0.00
<br />0.00
<br />0.00
<br />0.00*
<br />0.00
<br />0.00
<br />0.00
<br />0.00*
<br />0.00
<br />0.00*
<br />0.00
<br />0.00*
<br />2,667.62**
|