Laserfiche WebLink
ALTERNATIVE 2 - FORCEMAIN <br />• <br />£ GRAVITY SYSTm <br />• <br />14" D.I.P (Forceraain)550 L.F.inH- <br />• ^ <br />$ 8,250 <br />18" R.C.P.430 L.F.§ 15 -6,450 <br />Manholes 3 EACH ma\oo-1,800 <br />Lift Station LUMP SUM 40,000 <br />18" Concrete Apron 1 EACH 8 300 -300 <br />Rip-Rap 4 c.y.§ 20 -80 <br />Restoration LUMP SUM 2,000 <br />Contingencies 5,820 <br />Total Construction Cost $64,700 <br />Engineering» Legal fc Administrative 6,500 <br />Total Project Cost $71,200 <br />' • >• • <br />» :. # r.t « • >. <br />J <br />r ^ m 0 <br />• . • , * •-% - • # • ^*00 <br />:V • my V.' <br />**••-■ •• .V* • <br />y ‘ ‘