My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1994 Council Packet
Orono
>
City Council
>
1994
>
05-23-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:58:22 PM
Creation date
12/8/2023 3:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Similarly, Route B, Alternate 1, deals with a strictly gravity <br />outlet, where as Route B, Alternate 2, considers-a•.combination <br />of forcemain and gravity storm water conveyance. The respec <br />tive costs of these systems are included as a part of this <br />•^V <br />report <br />AS will be, noted, the forcemain syste.-a .costs are approx <br />imately double the gravity system costs. The selection of <br />either forcemain system is therefore not recommended. <br />The costs of constructing a gravity system are approx <br />imately equal for either routing. The decision as to which <br />routing is most favorable should therefore consider *he <br />non-cost factors involved in -each as the determining factors.
The URL can be used to link to this page
Your browser does not support the video tag.